Download presentation
Presentation is loading. Please wait.
Published byJordan Manning Modified over 9 years ago
1
BUILDING THE FINDHORN WIND PARK
2
Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park
3
The planning process Cost: £100k- No guarantee! Wind resource assessment Financial model RAF Application for planning permission Visual impact study Noise study Bird study
4
Visibility of the proposed turbines
5
The effect of other wind farms and proposals
6
EXCAVATION
8
ROTOR
11
NARCELLE
12
The annual output is 1,537 megawatt hours per annum
13
1,537 MWhr/annum 350 homes 475,000 litres of oil 660 tonnes carbon dioxide Planning permission Granted 18 Jan. 05
14
Financial Model ROC’s & LEC’s are about 50% of income Cost of generating power = 1.6 to 5.9 pence/kWh
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.