Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen
2
What physicists would like 2010: Start LHC@7TeV, cautiously increase energy and find the Higgs and first signs of new physics 2011: Approve the International Linear Collider. Operate it by about 2018. 2012: Approve a potent neutrino factory and a B-factory to reach 100 ab. 2014: LHC upgrade to increase statistics 2020: Start genuine “discovery machines” (CLIC and/or a muon collider) But the realistic timescale is rather longer!
3
CERNS accelerator complex
4
Large Hadron Collider
5
LHC in numbers Circumference: 27km Energy: 2x7 TeV Peak dipole field: 8.3 Tesla Injection: 450 GeV protons or A Protons per bunch: 1.1 10¹¹ Bunch spacing: 25 ns Stored energy/beam: 362 MJ
6
LHC in numbers Normalised emittance: 3.75 mm mrad beta function at IP (at inject): 10m beta function at IP (at coll.): 0.55m Beam size at IP: 16.6 mu Bunch length: 3.75cm Events per bunch crossing: 19 Peak luminosity: 10 34 cm-²s-¹
7
Possible luminosity upgrade Around 2015-16 LHC will have exhausted its potential. However by a 10-fold luminosity upgrade, the discovery reach could be moved about 0.5-1 TeV further out and precision measurements could be significantly improved. That would require a major machine and detector upgrade to withstand the radiation and deal with many thousands of particles per event.
8
International Linear Collider By 2000 a world-wide consensus developed that the next step would be a linear e+e- collider at 500 GeV, upgradable to 1 TeV, in order to do precision measurements in the Higgs sector and any new physics that were discovered at the LHC. Engineering design and go-ahead planned for in 2010. Price would be about 6 B$.
10
CLIC
12
Neutrino factory
13
Motivation Ideas from GUTs on mass hierarchy and on the mass mixing matrix Is the mass hierarchy “natural”? Is theta_13 really very small? Is theta_12 really close to pi/4? Very clean CP violation laboratory!
14
NEUFAC “An emerging facility” (European priority placed after LHC and also after ILC/CLIC) CERN-SG: 4.[…] it is vital to strengthen the advanced accelerator R&D programme; a coordinated programme should be intensified, to develop the CLIC technology and high performance magnets for future accelerators, and to play a significant role in the study and development of a high-intensity neutrino facility. 6.Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal neutrino programme based on the information available in around 2012 ; Council will play an active role in promoting a coordinated European participation in a global neutrino programme.
15
Low energy options
16
High Energy option (5-20 GeV) Nu factory does it all..
17
Other planned experiments Nu-factory best. But costs 2B$
18
Proton Driver Super Conducting Linac around 10 GeV around 4MW carried in beam! Feasible at CERN >2016 R&D at RAL: H- source, beam chopper
19
Target Optimization of Ep (HARP exp – CERN) Moving Tantalum wire (RAL R&D) High power LHg jet (MERIT exp - CERN)
20
Fast dE/dx cooling MICE@RAL to demonstrate one sector MICE@RAL First beam Jan 2008 – total cost 23M£
21
Other Ideas
22
Outlook It would be super to have it all - and fast! However, the sponsors are inclined to long lead-times for the post-LHC accelerators at the energy frontier. This could of course change if something really exiting were discovered at the LHC! So a good way to speed up future accelerators is to work hard on the LHC physics.