Download presentation
1
MID-TERM PURPOSED program
Mongolian Government Ministry of Road, Transport, Construction and Urban Development The NEW DEVELOPMENT MID-TERM PURPOSED program The program is aiming to resolve economical and social problems that we are encountering and assuring human’s right to live in healthy and safe environment by improving the urban planning, energy, engineering infrastructure, and road network to the world standard, increasing the accommodation supply for people, and providing work places for citizens. 2010
2
Solution for program implementation
The New Development Program have been included 33 goals of the 8 orientation. Orientation Ways to reach the goal Urban development and planning Infrastructure To improve the urban development and local infrastructure – To build auto roads between Ulaanbaatar city and province centers. Urban development and planning Infrastructure To create comfortable living condition in the local area – To implement the “New soum center” project To provide the social infrastructure to the local area residents – to create the housing with engineering infrastructure and social infrastructure as a hospital, school, kindergarten and workplace. Housing supply Work place Housing for Ulaanbaatar city and Regional centers –According to “100 thousand housing ” project, to put into exploitation housing unit in UB city and housing unit local areas. Air pollution Rural development Reduce the toxic smoke from auto cars and Ger area district – To transfer to gas of public transportation vehicle and housing for Ger area district To create the work place and good condition for rural residents - Industrialization Migration To create the workplaces in the projects and to involve the residents, people by wide brimmed. – By the vocational training center, improving the living standards of the people by helping the unemployed and unskilled to learn vocational knowledge and skill.
3
Basic content of the program implementation
Improvement of urban planning Increase heating supply system Increase electricity supply system Increase water supply system Increase road network Improvement of infrastructure Increase number of qualified workers Improve social infrastructure Reduction of poverty Housing supply Improvement health service Improvement in education service Improvement of cultural service Reduction of difference between rural area and urban Decreasing migration from rural area Reduce over centralization in urban area Planning unplanned area Decreasing smoke Decreasing soil pollution Decreasing dust Improvement in health Improvement in education Decreasing crime Reduction of unemployment Increase of housing
4
Solution for program implementation
Lifetime working Skill Retraining VTC Work place after building the district Permanent income R<R2 Citizens with unstable work place R=? Construction workers Step 1: training skills VTC Vocational training center Upbuilding Work place Money accumulation R<R1 R1+R2=TR 4-5 year To give a VP TR>Mortgage+ VC Long term housing credit with low percent Unemployed citizens R=0 The result Permanent work place Permanent income Safe environment Confidence of the future ¯ÒÝÝÃ× ÌÎÍÃÎË ÈÐÃÝÍ Unemployed citizens with excuse reason R=0 Kindergarden Rest home center 4
5
100 THOUSAND HOUSING PROJECT
New Development Program 100 THOUSAND HOUSING PROJECT 2010 5
6
Solution for program implementation
Housing household housing in Ulaanbaatar city UVS ULAANGOM KHUVSGUL ӨЛГИЙ МӨРӨН ДАРХАН SELENGE BAYAN-ULGII ZAVKHAN ЭРДЭНЭТ ARKHANGAI KHENTII ХОВД УЛИАСТАЙ УЛААНБАÀТАР ЧОЙБАЛСАН KHOVD DORNOD ЗУУНМОД ЦЭЦЭРЛЭГ ТӨВ ӨНДӨРХААН SUKHBAATAR GOBISUMBER БАРУУН-УРТ АЛТАЙ БАЯНХОНГОР АРВАЙХЭЭР ЧОЙР DUNDGOBI МАНДАЛГОВЬ GOBI-ALTAI UVURKHANGAI САЙНШАНД 5 000 household housing in the Eastern region BAYANKHONGOR ДАЛАНЗАДГАД DORNOGOBI UMNUGOBI 5 000 household housing in the western region household housing in the Central region 5 000 household housing in the Khangai region According to “100 thousand housing unit” project, housing unit will construct in the Ulaanbaatar city housing unit will construct in the local area.
7
Solution for program implementation
Улаанбаатар хотод Bayangol Yarmag VII district Around MNB New XIV district Khaniin material Buyant Ukhaa Around Denj 1000 7 The household housing will construct with engineering and social infrastructure.
8
COMPLEX WITH APARTMENT BUILDING
Result The number of apartment building COMPLEX WITH APARTMENT BUILDING Secondary school (students) Kindergarten (children) Hospital (bed ) Vocational training center (Students) Student’s town (Students) Commercial center (labor number) Engineering infrastructure Others In Ulaanbaatar city 75,000 59,180 17,275 850 6,840 20,000 28,050 Complex In local area 25,000 19,172 6,420 890 3,320 33,000 8,830 Total 100,000 78,352 23,695 1,740 10,160 53,000 36,880 INVESTMENT (billion tugrug MNT) 4,642.0 226.5 115.7 235.2 38.6 861.7 271.7 1,708.5 539.5
9
New Development Program
Road PROJECT 2010 9 9
10
Solution for program Implementation
ДАРХАН ДАЛАНЗАДГАД DORNOGOBI TUV DUNDGOBI МАНДАЛГОВЬ SUKHBAATAR DORNOD ӨЛГИЙ ZAVKHAN ЧОЙР МӨРӨН БАЯНХОНГОР ЭРДЭНЭТ ЦЭЦЭРЛЭГ АРВАЙХЭЭР ARKHANGAI KHUVSGUL ULAANGOM УЛИАСТАЙ ХОВД UVS САЙНШАНД GOBISUMBER ЧОЙБАЛСАН БАРУУН-УРТ ӨНДӨРХААН ЗУУНМОД KHENTII SELENGE АЛТАЙ KHOVD UMNUGOBI GOBI-ALTAI UVURKHANGAI BAYANKHONGOR BAYAN-ULGII ULAANBAATAR Ulaanbaishint Khandgait Artc suuri Baga-Ilenkh Khankh Altanbulag Ereentcav Ulikhan Khavirga Bichigt Zamiin Uud Gashuun Suhait Burgastai Yarantai Dayan Shivee Khuren Solution for program Implementation Road network . Through Road project, will be connected all province centers with Ulaanbaatar city and with near state borders. Expected results: Will be improved local communication Will be transportation cost reduce, and local residents livelihood level will be improve Will be developed communication between city and local area, stop rapidly migration to the Ulaanbaatar city.
11
2 level intersection of the Western IV road , Eastern IV road
Solution for project implementation Renew the 350 km auto road and build the 212 km new road and construct the 2 level intersection in 7 locations, it will reduce the overload on the I, II circle road, and improve the traffic capacity of the main roads and decrease the volume on the branch roads. 2 level intersection of the Western IV road , Eastern IV road
12
7 location 2 level intersection
Result Infrastructure network NEW AUTO ROADS CAPACITY INVESTMENT (Billion MNT) Auto roads connected with province centers, state borders, Ulaanbaatar city. 5572 êì 2,318.7 Altanbulag-Ulaanbaatar-Zamiin Uud route highway. 990.4 êì 2,583.9 Redevelopment of the Ulaanbaatar city road network. 350 êì renew 212 êì new 7 location 2 level intersection 1,111.9 Total 6,014.5
13
New Development Program
Soum center project 2010 13 13
14
Solution for program implementation
Soum center UVS ULAANGOM KHUVSGUL ӨЛГИЙ МӨРӨН SELENGE ДАРХАН BAYAN-ULGII ZAVKHAN ЭРДЭНЭТ ARKHANGAI KHENTII ХОВД УЛИАСТАЙ УЛААНБАÀТАР ЧОЙБАЛСАН KHOVD DORNOD ЗУУНМОД ЦЭЦЭРЛЭГ ТӨВ ӨНДӨРХААН SUKHBAATAR GOBISUMBER БАРУУН-УРТ АЛТАЙ БАЯНХОНГОР АРВАЙХЭЭР ЧОЙР DUNDGOBI МАНДАЛГОВЬ GOBI-ALTAI UVURKHANGAI САЙНШАНД soums in the Eastern region BAYANKHONGOR ДАЛАНЗАДГАД DORNOGOBI UMNUGOBI soums in the western region Soums in the Central region Soums in the Khangai region According to “Soum center” project, first 96 soums will developed in Mongolia based on Canadian wood technology.
15
Administration unit of the Soum
Solution for project implementation New Soum Center Total 331 soums of Mongolia can be categorized into 96 regions according to geographical location and the “Soum center"project along with Housing Project can be implemented. After implementation, migration from rural area to urban area will be reduced and much needed jobs will be created and retained in rural areas. In the Soum center: 2160 sq.m Administration unit building 420 student’s capacity boarding school building 180 kid’s capacity kindergarten 960 sq.m hospital 1215 sq.m sport complex 400 houisng unit 932,640.0 million MNT investment necessary to implement the “Soum center” project during the years. Sport complex Kindergarten, Hospital Housing, Commercial School Administration unit of the Soum
16
PROGRAM IMPLEMENTATION COST
The cost of “New Development program” PROGRAM IMPLEMENTATION COST (in mln MNT) Type of the Investment Ulaanbaatar city Local and rural area Total amount Total investment 4,688,215.81 4,229,153.20 8,917,369.01 Source State budget 844,539.71 Loan 92,455.00 Others 3,751,221.10 7,980,374.30 6,077,764.32 3,284,398.50 9,362,162.82 386,424.32 0.00 5,691,340.00 8,975,738.50 Total 10,765,980.13 7,513,551.70 18,279,531.83 1,230,964.03 9,442,561.10 16,956,112.80
17
7 location 2 level intersection
Required investment PROJECT, PROVISION CAPACITY INVESTMENT (Billion MNT) One. “100 thousand housing” project 8,610.6 1.1. In Ulaanbaatar city For engineering and social infrastructure work houses 2,323.1 For construction work 4,153.3 1.2. In the local areas and province centers houses 1,146.6 988.6 Two. Auto road project 6,014.5 2.1. The auto roads connect between province centers, state borders and Ulaanbaatar city. 5572êì 2,318.7 2.2. Altanbulag-Ulaanbaatar-Zamiin Uud route highway 990.4êì 2,583.9 2.3. Redevelopment for Ulaanbaatar city auto road network 350 êì renew 212êì new 7 location 2 level intersection 1,111.9 Three. “New soum center” project 932,6 3.1. For engineering infrastructure work 96 zones 236.6 3.1. For construction work 696.0 Four. Improvement of public transportation vehicles 2.658,7 4.1. To transfer to gas of 1000 public transportation buses 1000 bus 4.4 4.1. To buy the taxi it works by gas 2000 taxi 29.2 Five . For remove the smoke, infrastructure, green zones 2,625.1 TOTAL 18,217.3
18
Source of investment 18.2 trillion MNT 2010 2015 2020 2025 2030 2035 2040 2045 If we invest from state budget it will take 30 years. If we invest based on Pre-export finance from mineral sources it will take 6 years. USD’1 = MNT’1340 Based on Mongol Bank official exchange rate of 24th August, 2010
19
Program financing structure
Escrow account / Repayment Reserve Account / Individual Facility agreement 1 Mongolian Energy and Resource Suppliers 100,000 Housing Project in Mongolia Foreign Lender: Bank Borrower: MDBank Facility agreement 2 Facility agreement 3 Road Project Soum center Project Foreign Importer 19
20
After program implementation
Positive effects to the social Present situation After program implementation Workplace Sustainable household income Smoke Poverty
21
THANK YOU FOR YOUR ATTENTION
21 21 21
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.