Download presentation
Presentation is loading. Please wait.
Published byJoleen Poppy Rogers Modified over 9 years ago
1
North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee River Management Coordinating Council September 24, 2007
2
Agenda Project Status and Summary Operations Report Questions?
3
Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir CERP Proposed Storage and Flow-way Improvements
4
L-8 Reservoir – August 2007
5
L-8 Reservoir – Temporary Pumps
6
M Canal Widening Control #2 Pump Station G-161 Northlake Bridge G-160 Flow-way #1 Grassy Waters Preserve – M Canal
7
Control #2 Pump Station
8
M-Canal Widening Improved Section Unimproved Section
9
Grassy Waters Preserve – M Canal M Canal Open Cut to Interior
10
G-161 Northlake Boulevard Structure
11
Northlake Bridge Structure
13
G-160 Loxahatchee Slough Structure
14
Flow-way #2 CGCDD Flow-way ITID Flow-way Mecca Farms Flow-way C-18W Improvements
15
Coordination with Local Government Agencies Conceptual Sector Plan Mecca Farms
16
Indian Trail Improvement District – Outfall Canal
17
Indian Trail Improvement District – MO Canal
18
Indian Trail Improvement District – MO and L Canal
19
J.W. Corbett WMA – Southeast Area
20
Canal C-18 West - Improvements
21
Flow-way #3 NineGems Restoration Culpepper Ranch Improvements Storage or Wetland Restoration Cypress Creek Improvements
22
Flow-way #3
24
Control #2 Pump Station G-161 G-160 Periodic Operations Report for Flow-way #1 Structures L-8 Reservoir S-46 G-92 Lainhart Dam
25
G-160 Periodic Operations Report for Flow-way #1 Structures S-46 G-92 Lainhart Dam
27
G-92
28
S-46
29
G-160
30
Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir Summary
31
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.