North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee.

Similar presentations


Presentation on theme: "North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee."— Presentation transcript:

1 North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee River Management Coordinating Council September 24, 2007

2 Agenda Project Status and Summary Operations Report Questions?

3 Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir CERP Proposed Storage and Flow-way Improvements

4 L-8 Reservoir – August 2007

5 L-8 Reservoir – Temporary Pumps

6 M Canal Widening Control #2 Pump Station G-161 Northlake Bridge G-160 Flow-way #1 Grassy Waters Preserve – M Canal

7 Control #2 Pump Station

8 M-Canal Widening Improved Section Unimproved Section

9 Grassy Waters Preserve – M Canal M Canal Open Cut to Interior

10 G-161 Northlake Boulevard Structure

11 Northlake Bridge Structure

12

13 G-160 Loxahatchee Slough Structure

14 Flow-way #2 CGCDD Flow-way ITID Flow-way Mecca Farms Flow-way C-18W Improvements

15 Coordination with Local Government Agencies Conceptual Sector Plan Mecca Farms

16 Indian Trail Improvement District – Outfall Canal

17 Indian Trail Improvement District – MO Canal

18 Indian Trail Improvement District – MO and L Canal

19 J.W. Corbett WMA – Southeast Area

20 Canal C-18 West - Improvements

21 Flow-way #3 NineGems Restoration Culpepper Ranch Improvements Storage or Wetland Restoration Cypress Creek Improvements

22 Flow-way #3

23

24 Control #2 Pump Station G-161 G-160 Periodic Operations Report for Flow-way #1 Structures L-8 Reservoir S-46 G-92 Lainhart Dam

25 G-160 Periodic Operations Report for Flow-way #1 Structures S-46 G-92 Lainhart Dam

26

27 G-92

28 S-46

29 G-160

30 Flow-way #1 Flow-way #2 Flow-way #3 L-8 Reservoir Summary

31 Questions?


Download ppt "North Palm Beach County – Part 1 Comprehensive Everglades Restoration Plan Loxahatchee River Management Coordinating Council September 24, 2007 Loxahatchee."