Site Lightning Report: MWT2 Mark Neubauer University of Illinois at Urbana-Champaign US ATLAS Facilities UC Santa Cruz Nov 14, 2012.

Similar presentations


Presentation on theme: "Site Lightning Report: MWT2 Mark Neubauer University of Illinois at Urbana-Champaign US ATLAS Facilities UC Santa Cruz Nov 14, 2012."— Presentation transcript:

1 Site Lightning Report: MWT2 Mark Neubauer University of Illinois at Urbana-Champaign US ATLAS Facilities Meeting @ UC Santa Cruz Nov 14, 2012

2 Midwest Tier-2 2 Three site Tier-2 consortia 0101001011110… The Team: Rob Gardner, Dave Lesny, Mark Neubauer, Sarah Williams, Illija Vukotic, Lincoln Bryant, Fred Luehring

3 Midwest Tier-2 3 Focus of this talk: Illinois Tier-2

4 Tier-2 @ Illinois 4 History of the project: – Fall 2007−: Development/operation of T3gs – 08/26/10: Torre’s US ATLAS IB talk – 10/26/10: Tier2@Illinois Proposal submitted to US ATLAS Computing Mgmt – 11/23/20: Proposal formally accepted – 10/5/11: First successful test of ATLAS production jobs run on Campus Cluster(CC) Jobs read data from our Tier3gs cluster

5 Tier-2 @ Illinois 5 History of the project (cont): – 03/1/12: Successful T2@Illinois Pilot Squid proxy cache, Condor head node  job flocking from UC – 4/4/12: First hardware into Taub cluster 16 compute nodes (dual x5650, 48 GB memory, 160 GB disk, IB)  196 cores 60 2TB drives in DDN array  120 TB raw – 4/17/12: PerfSONAR nodes online

6 Illinois Tier-2 6 T2onTaub History of the project (cont) – 4/18/12: T2@Illinois in production

7 Illinois Tier-2 7 Stable operation: Last two weeks

8 Illinois Tier-2 8 Last day on MWT2:

9 Why at Illinois? 9 National Center for Supercomputing Applications (NCSA) National Petascale Computing Facility (NPCF): Blue Waters Advanced Computation Building – 7000 sq. ft with 70” raised floor – 2.3 MW of power capacity – 250 kW UPS – 750 tons of cooling capacity Experience in HEP computing NCSA Building ACB NPCF

10 Tier-2 @ Illinois 10 Deployed in a shared campus cluster (CC) in ACB – “Taub” first instance of CC – Tier2@Illinois on Taub in production within MWT2 Pros (ATLAS perspective) – Free building, power, cooling, core infrastructure support w/ plenty of room for future expansion – Pool of Expertise, heterogeneous HW – Bulk Pricing  important given DDD (Dell Deal Demise) – Opportunistic resources Challenges – Constraints on hardware, pricing, architecture, timing

11 Tier-2 @ Illinois 11 Current CPU and disk resources: 16 compute nodes (taubXXX) – dual x5650, 48 GB memory, 160 GB disk, IB)  196 cores  ~400 js 60 2TB drives in Data Direct Networks (DDN) array  120 TB raw  ~70 TB usable

12 Tier-2 @ Illinois 12 Utility nodes / services (.campuscluster.illinois.edu): – Gatekeeper (mwt2-gt) Primary schedd for Taub condor pool – Flocks other jobs to UC and IU Condor Pools – Condor Head Node (mwt2-condor) Collector and Negotiator for Taub condor pool – Accepts flocked jobs from other MWT2 Gatekeepers – Squid (mwt2-squid) Proxy cache for CVMFS, Frontier for Taub (backup for IU/UC) – CVMFS Replica server (mwt2-cvmfs) CVMFS replica server for Master CVMFS server – dCache s-node (mwt2-s1) Pool node for GPFS data storage (installed, dCache in progress)

13 Next CC Instance (to be named) Overview 13 Mix of Ethernet-only and Ethernet + InfiniBand connected nodes – assume 50-100% will be IB enabled Mix of CPU-only and CPU+GPU nodes – assume up to 25% of nodes will have GPUs New storage device and support nodes – added to shared storage environment – Allow for other protocols (SAMBA, NFS, GridFTP, GPFS) VM hosting and related services – persistent services and other needs directly related to use of compute/storage resources

14 Next CC Instance (basic configuration) 14 Dell PowerEdge C8220 2-socket Intel Xeon E5-2670 – 8-core Sandy Bridge processors @ 2.60GHz – 1 “sled” : 2 SB processors – 8 sleds in 4U : 128 cores Memory configuration options: – 2GB/core, 4GB/core, 8GB/core Options: – InfiniBand FDR (GigE otherwise) – NVIDIA M2090 (Fermi GPU) Accelerators – Storage via DDN SFA12000 – can add in 30TB (raw) increments Dell C8220 compute sled

15 Summary and Plans 15 New Tier-2 @ Illinois – Modest (currently) resource integrated into MWT2 and in production use – Cautious optimism: Deploying an Tier-2 within a shared campus cluster a success Near term plans – Buy into 2 nd campus cluster instance $160k of FY12 funds with 60/40 CPU/disk split – Continue dCache deployment – LHCONE @ Illinois due to turn on 11/20/12 – Virtualization of Tier-2 utility services – Better integration into MWT2 monitoring