Bauer Equipment and Systems on Projects around the World
2
Is there risk in foundation ?
3
...our ancestors built safely in rock...
“almost for eternity”
4
or later on rock
5
...and the longest wall on earth
6
...in the middle ages on dense river sediments like gravel or sand except the following case...
7
...a total foundation disaster but a famous tourist attraction as well
8
... being under investigation and repair since 800 years
9
equipment evolution from 1950 - now
10
piled foundation with BG and Kelly- bar
11
foundation pile installation
12
BG fleet in congested Bangkok
13
BG 42 in TFC in Taiwan bored piles with skin or base grouting, 1500 mm, 80 m long, verticality 1 / 200 !, BG 42, BG 40
14
post grouted pile skin grouting base grouting
15
test result of grouted piles
16
pile load test using tiebacks
steel plant Jubail, Saudi Arabia
17
extension of Zurich Airport
Bauer portion: piles Ø 1180 mm and Ø 1500 mm, 35 m long
18
BG 18/30, secant pile wall
19
secant piles as retaining wall by BG
Meyer´s Centre Adelaide, Australia Primary piles Ø 620 mm, secondary piles 880 mm, BG 11 and BG 7
20
quality control system Medef
21
BG 12 on rail tracks in New Jersey, USA
22
river and offshore piles
BG 26 with BV at Leer, Ems, 67 piles Ø 1800 mm, 30 m deep, raked 1:10 Kirkuk Haditha railway bridge over Tigris, Beiji Northern Irak, foundation piles Ø 1500 mm with Weserhütte and BV, 50 m deep, secant pile walls Ø 1000 mm, 12 m deep
23
BG 50, Huang Shi Jangtze bridge, China
Bored piles Ø 3000 mm, 70 m long, embedded 10 m into sandstone
24
BG 30 on jack- up platform in Oman
Natural gas jetty Oman, raked piles 18 °, 1200 mm, 44m long, 20m deep water, BG 30, Archiorodon
25
BA 2000 at Porto do Pecem jetty, Brazil
Oil jetty Porto do Pecem north of Fortaleza, 300 piles Ø 930 mm, 53 m deep, BA 2000
26
top down method for traffic tunnels
Inter City Express
27
BG piles under limited headroom
BG 30 low head room, Japan
28
high speed flight auger piles
29
front of wall secant piles
30
BG 42 DKS for bored piles
31
mixed in place piles or pile walls
32
full displacement pile,
highest performance !
33
diaphragm walls with DHG- grab
34
diaphragm walls with BC- cutter
Louvre, Paris Royal Diwan, Jeddah
35
BC 30 at Louvre in Paris
36
BC- cutter with slurry circle
37
diaphragm wall with BC 40- cutter
Al Suknah, Oman 1,5 m thick and 33 m deep quai wall in harbour Al Suknah, 20 km from the sea, 2 BC 40, 2 DHG, tied back with steel girders to 1 m thick and 15 m deep dead man wall, total m2,
38
low headroom cutter CBC 25
39
MBC ( Mini Bauer Cutter )
MRT Taipei Boston Artery
40
temporary tiebacks installed by UBW
41
excavated tieback
42
permanent tiebacks for Olympic Games area in Munich, 1972
43
H- beam or soldier pile wall
44
soil nailing large scale load test
45
jet grouting for underpinning
monastery Trzebnia, Poland Academy of arts, Dresden
46
jet grouting with result
47
desalination plant Jeddah 3 Airport Munich Terminal 2
dry excavation pit desalination plant Jeddah 3 Airport Munich Terminal 2
48
vibrocompaction with TR- vibrators
power plant Algeciras, Spain
49
vibrocompaction
50
vibrodisplacement or stone columns
51
Formosa Mai- Liao Plant, Taiwan
52
B- wall as flood defence
53
B- wall or slim vib- wall
steel profile shoe with jet
54
drains and dynamic compaction
55
special foundation techniques in Berlin
56
Thank you for your kind attention !