HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ TOC in Supply Chain Management Dr. James R. Holt, PE (Jonah-Jonah) Washington State University 14204 NE Salmon Creek Avenue Vancouver, WA 98686
2
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ The Supply Chain Raw Materials Refine / Prepare ProduceTransport DistributeRetailCustomer
3
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Short & Long Duration Chains Dairy Cows CreameryDeliverRetail Customer FarmerCanneryWholesaleRetail Customer
4
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Complex Combinations Brakes Tires Bumpers Upholstery Engine Transmission Manuf. Car Lot Car Lot Car Lot
5
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Dedicated Chain MineSmelter Rolling Mill Product Steel Sales Independent Business Unit Single Firm - Totally Owned Industry - Sole Source Transfer Prices Fixed by Policy
6
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Competitive Link Opportunity Oil Well Refinery Chemical Plant Cloth Mill Dress Factory Customer Oil Well Refinery Chemical Plant Cloth Mill Dress Factory Customer Oil Well Refinery Chemical Plant Cloth Mill Dress Factory Customer Transfer Prices at Market Prices
7
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Independent Business Component Process SupplierClient Transactions Purchase Receive Check Pay Internal Processing Individual Member of Chain Sell Deliver Invoice Collect Profit=Sales-Purchase-Inventory Cost-Overhead
8
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Simple Dist. Chain Game My Plan for the Week I Order PartsParts Come In Beginning Inv.Avail. Inventory The Actual for the Week Orders Rec’vd Orders Filled Back Orders Product Flow Income @ $+50 BO @ $ -50 Cash Flow Inv. @ $ -10Remaining Inv. $ Weekly Income 1. 2. 3. 4.
9
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Simple Game Example My Plan for the Week I Order PartsParts Come In Beginning Inv.Avail. Inventory The Actual for the Week 5 6 5 11 Orders Rec’vd 4 Orders Filled Back Orders Product Flow 4 Income @ $+50 BO @ $ -50 Cash Flow 200 0 Inv. @ $ -10 -70 Remaining Inv. 7$ 130 Weekly Income 1. 2. 3. 4.
10
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Black Bean Business
11
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Generic Supply Chain Conflict To meet customer demands (next link in chain as well as the end customer) I need to keep a significant inventory. But, the cost of inventory deeply erodes my profits. Missing an order erodes my future profits. My forecasts are inaccurate and replenishment takes too long. I’m stuck between a rock and a hard place. We effectively meet our customer requests Supply Quickly and Avoid Stock Outs (Back Orders) Minimize the Cost of Operation Maintain High Levels of Inventory Maintain Low Levels of Inventory
12
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Traditional Supply Chain Solution Raw Materials ProduceDistributeRetail Customer
13
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Typical Production Solution Raw Materials Machine 1 Machine 2 Machine 3 Warehouse
14
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Difficulty in Forecasting
15
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Potential Future
16
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Adjusting for Product Life
17
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Inventory Demand Probability Mean 50 Std Dev 10 90% Sure Inventory Level 70
18
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ DBR Production Solution Raw Materials Constraint Machine Warehouse Constraint Buffer Protects Replenishment Shipping Buffer Protects Short Lead Demand Low inventory system is very responsive to customer needs. Low inventory system is product change.
19
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Non-Cooperative Supply Chain Raw Material Produce Constraint TransportDistribute Retail Customer ConstraintClient Supply Watch Diligently Just-in-Time Production Using DBR
20
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Reference Supply Chains SnowRiverDamGenerator Power lines Customer Water Well Water Treatment Distribution Water Tower Local Lines Customer
21
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Cooperative Supply Chain Raw Material Produce Constraint TransportDistribute Retail Customer In the best world, individual business units cooperate and receive payment only when final customer pays. Inventory is greatly reduced. Quick delivery and response to change is possible.
22
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ How to…? Start with Two Before ConstraintClient Supply Watch Diligently ConstraintClient Supply Watch Diligently Firm 1 Firm 2 After ConstraintClient Supply Watch Diligently Client Supply Watch Diligently Firm 1 Firm 2
23
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Transfer Costs in Cooperating Chains Cap. 40/wk Cap. 40/wk Labor $10/hour OE $20/hour RM $20 TPM $60 Sell $100 Labor $10/hour OE $20/hour T=$1600 Labor=$-400 OE=$-800 Profit=$400 Firm Total T=$3200 Labor=$-800 OE=$-1600 Profit=$800
24
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Incentive to Switch Cap. 40/wk Cap. 40/wk Labor $10/hour OE $20/hour RM $20 35@ $60 Sell $100 Labor $10/hour OE $20/hour T=$1650 Labor=$-400 OE=$-800 Profit=$450 T=$1400 Labor=$-400 OE=$-800 Profit=$200 Firm Total T=$3050 Labor=$-800 OE=$-1600 Profit=$650 Market 5ea @$70
25
HTTP://WWW.CEA.WSU.EDU/ENGRMGT/ Cooperative Dedicated Sources Cap. 40/wk Cap. 40/wk RM $20 35@ $60 Cap. 40/wk RM $20 Best Supplier 60% of Orders Lesser Supplier 40% of Orders Sell $100