Download presentation
Presentation is loading. Please wait.
Published byEthelbert Gray Modified over 9 years ago
2
The Interstate Traveler Company, LLC Presents: The Hydrogen Super Highway To: The Citizens of Central Florida 10-7-2007 Energy Security for the United States and the World via a commercially developed global network of solar powered, hydrogen producing, self sustaining maglev rail with embedded municipal conduit for water, sewer, fiber-optics, superconducting cables, and other vapor or fluid materials, etc. The opportunity to lead the nation…
3
The Interstate Traveler Company, presents the… Hydrogen Super Highway A system designed to upgrade the entire US Interstate Highway Network
4
What is the Interstate Traveler? Transportation System Solar Energy Collection Grid Municipal Conduit Hydrogen Production & Distribution Energy Storage & Distribution Wireless Internet Access Millions of Tons of Stainless Steel Many Thousands of Jobs …and so much more…
5
The Ten Primary Deliverables 1.Rapid Transit= $ /minute 2.Advertising= $ /sign 3.Hydrogen= $ /kilogram 4.Electricity= $ /kilowatt 5.Energy Storage= $ /kilowatt 6.Fiberoptics= $ /bandwidth 7.Fuel pipelines= $ /gallon or cubic foot 8.Liquid waste= $ /barrel 9.Brand New Water= $ /liter 10.Internet / Telecom= $ /minute … and there are many more…
6
Public Private Partnership (State Level Management) 50% Revenue Sharing 50% Divided into four levels of government based on Statewide performance of the Ten Deliverables. From Total Revenue: 12.5 % Paid to the Federal Treasury 12.5 % Paid to the State Treasuries 12.5 % Divided among all the Counties per State 12.5 % Divided among all the Local Governments such as Cities, Townships, Villages, Ports and Tribal Lands (Per Capita)
7
Eisenhower Traveler Revenue 50% Revenue Sharing (50%) $242 Billion / year paid to Government Split four ways: (12.5%) $60.5 Billion to the Federal Treasury (12.5%) $60.5 Billion divided among the States (12.5%) $60.5 Billion divided among the Counties (12.5%) $60.5 Billion divided among the local governments. *Per Capita* 54,000 Miles of ITC Rail Nationally
8
Eisenhower Interstate Traveler Eisenhower Interstate system 54,000 + miles Basic ‘Round Number’ System Estimates: 162,000 -Transports 22,000 -Traveler Stations 18,000 -Utility Substations 45,900,000,000 -watt/hour capacity (45.9 Billion Watts) 156,656,700,000 -BTU/hour (3.413 BTU/ watt-hour) 1,620,000 -gallons of water per hour 9,720,000 -passenger capacity $540,000,000,000 -cost to build at $10 Million / mile $242,000,000,000 -Annual Public Revenue 9,720,000 -Passenger Capacity 750,000,000 -Tons of Stainless Steel
9
Key Metrics Cost Range: $10-$20 Million / Mile (parallel track) 4800 tons of steel / mile (rail only) 85,000 square feet of PV / mile ~ 1 Megawatt / mile / solar-hour ~ 238 cubic meters of hydrogen / mile / hour ~ 30 gallons of water / mile / hour (purification) Self sustaining 3-100 Transports Per Mile 24/7/365 (variable mass) Standard Installation includes: 3 Transports / 1 mile 2 Traveler Stations / 5 miles 1 ITC Utility Substation / 3 Miles The Hydrogen Superhighway
10
Hydrogen Super Highway Infrastructure for Homeland Security 1.National Security 1.Internet Backbone Backup 2.Real-time Sensor Network 3.Public, Private, Commercial and Military Networks 2.Evacuation of Cities & Coastlines 1.Fast network reconfiguration 2.On demand Transport Deployment 3.Humanitarian & Military Systems 1.Hydrogen / Electricity Production 2.Communications 3.Logistical delivery 4.Tsunami Relief / War Reconstruction
11
The Hydrogen Super Highway ITC Rail & Conduit Cluster
12
The Hydrogen Superhighway ITC Rail - Solar Skin
13
3 Primary Travelers The Hydrogen Superhighway
14
Wonderful Variety Public and Privately Owned Transports
15
Copyright 2005 ITC, LLC www.InterstateTraveler.us Triage Traveler
16
Copyright 2005 ITC, LLC www.InterstateTraveler.us Active Floor Restraint
17
Copyright 2005 ITC, LLC www.InterstateTraveler.us Parkway Traveler
18
Inter-Urban Integration The Parkway Traveler
19
ITC International Traveler
20
Rapid Installation
21
Suburban Boulevard Integration The Hydrogen Superhighway
22
Scalable Systems ½ Scale = 6 Foot Gage
23
Interstate Highway Integration – Model The Hydrogen Superhighway
24
Interstate Highway Integration The Hydrogen Mega Highway
25
Interstate Highway Integration The Hydrogen Superhighway
26
ITC Energy Cycle
27
Hydrogen Power Conversion ITC Utility Substation The Hydrogen Superhighway
28
We Create Pure Water From virtually any water source…..
29
The Interstate Traveler Dynamic Suspension System
30
The Interstate Traveler
31
Copyright 2005 ITC, LLC www.InterstateTraveler.us The Hydrogen Superhighway Scalable Geometry
32
The Hydrogen Superhighway Computer Simulations
33
Suspension System The Hydrogen Superhighway
34
G-Force Compensator The Hydrogen Superhighway
35
ITC Dynamic Suspension The Hydrogen Superhighway
36
Finite Element Analysis The Hydrogen Superhighway
37
Copyright 2005 ITC, LLC www.InterstateTraveler.us Coil Arrangement
38
Copyright 2005 ITC, LLC www.InterstateTraveler.us ITC Magnetic Field / Coil Arrangement ITC Slotted Linear Motor Cross Section The Hydrogen Superhighway
39
Copyright 2005 ITC, LLC www.InterstateTraveler.us The Hydrogen Superhighway
40
Copyright 2005 ITC, LLC www.InterstateTraveler.us The Hydrogen Superhighway
41
Copyright 2005 ITC, LLC www.InterstateTraveler.us The Hydrogen Superhighway
43
ITC Linear Motor Tech The Hydrogen Super Highway
44
ITC Linear Motor Tech The Hydrogen Superhighway
45
Respectfully Submitted Respectfully Submitted by: The Interstate Traveler Company, LLC 9594 Main Street Whitmore Lake, Mi 48189 734-449-4480 Ph 734-449-4486 Fx www.InterstateTraveler.us To: The State of Indiana And The Federal Highway Administration
46
Copyright 2005 ITC, LLC www.InterstateTraveler.us
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.