Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement.

Similar presentations


Presentation on theme: "Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement."— Presentation transcript:

1

2 Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement design life of 20 years Part of Interstate Highway System Maintenance cost $ 49,375 per mile

3 Katy Freeway - Reality GRIDLOCK 207,800 vehicles per day 11 hours daily congestion 30 to 40 year old pavement Annual maintenance costs of $ 197,500/mile (4 times normal highway maintenance costs)

4

5 23 mile section from IH 610 to Fort Bend County line 8 main lanes, 2 managed lanes, 6 feeder lanes Construction 2003 - 2009 10 Sections Beginning at east and west ends working to center First construction contract awarded June 11, 2003

6 $ 2,400,000,000 CONSTRUCTION COST (excludes ROW,utilities)

7

8 UTILITY ADJUSTMENTS Expense of TxDOT’s ROW Division ROW acquisition,relocation assistance,utility relocation $599,000,000 Construction period spans 2003-2009 Annual Statewide Budget - $300,000,000 for all TxDOT ROW Division Katy utility adjustments alone will be one-third of ROW Division’s budget for three years running

9 CenterPoint Energy Work 40 miles of OH distribution 42 underground distribution crossings 21.5 miles of Entex gas lines Fiber optic reroute and one T-comm antennae 5.7 miles OH Transmission 138kV double circuit converted to UG 3 Substations modified for UG Transmission

10 $ 110,000,000 Transmission Substation Overhead Distribution Underground Distribution Fiber Optics Entex 28 Contracts over 2003 - 2006

11 Bureaucratic Red Tape Unprecedented amount of Bureaucratic red tape Extended review/approval time for Utility Adjustment contracts Hesitant to make decisions Disconnect between TxDOT’s local office and Austin

12 TXDOT Contract required for relocations prior to start of any construction Austin-TXDOT review/approval of contracts Construction overhead cost issue 431 parcels required for project.Not all parcels acquired prior to construction letting GEC (PB) controls project Project Website established

13 CenterPoint Energy Underground Distribution 45 locations with proposed underground 42 crossings of I-10 (Katy Freeway) 90 estimates/work orders Plan & profile drawings and traffic control plans - 120 drawings, 80 traffic control [plans

14 CEHE Drawing review required by all utilities through GEC - PB Project crossed ROW of several governmental agencies –TXDOT –Harris County Flood Control –Army Corp of Engineers –City of Houston –Hedwig Village –Spring Valley –Hunters Creek

15 CEHE TXDOT lacked numerous parcels but still expedited construction schedule Directional bores 3 dry bore crossings Existing easements, required temporary construction easements for work area City permits - lane closures,street cuts

16 CEHE Distribution Underground Status 10 Sections (42 crossings total) –24 crossings complete –Sections 1,2,8,9,10 - 100% complete –8 crossings under construction –7 on hold - require ROW by TXDOT –3 crossing scheduled for 2006

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68


Download ppt "Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement."

Similar presentations


Ads by Google