Presentation is loading. Please wait.

Presentation is loading. Please wait.

Air Group One Expansion Project Phase 1 Design and Cost Analysis.

Similar presentations


Presentation on theme: "Air Group One Expansion Project Phase 1 Design and Cost Analysis."— Presentation transcript:

1 Air Group One Expansion Project Phase 1 Design and Cost Analysis

2 An Air Group One for the Future, San Diego’s Commemorative Air Force.

3 Overview  hangar to maintain 5-6 warbird aircraft. 1 large warbird  Relief from costs of commercial lease and exponential rise in costs, securing AG-1’s future.  Open to the public  Higher priority/status at Gillespie Field  Shop and work area for volunteer projects

4 Design

5 Public Viewing Area

6 Workshop for Volunteers

7 Museum open to the public

8 Costs  The project can be incremental depending on the financing plan.  $20/square foot for the structure of 120’x100’ = $240,000  $5/square foot for concrete 7” deep for hangar = $60,000  Additional ramp area. $40,000  $50,000 for soft costs  $390,000 for Total Estimated Costs


Download ppt "Air Group One Expansion Project Phase 1 Design and Cost Analysis."

Similar presentations


Ads by Google