Presentation is loading. Please wait.

Presentation is loading. Please wait.

 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.

Similar presentations


Presentation on theme: " Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB."— Presentation transcript:

1  Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB

2  Take 5 for Safety………..Ed LessardEd Lessard

3  APEX on 20 Feb, 5:00AM – 5:00PM.   * squeeze to 60cm went well in APEX, so we skipped intermediate stages, 80cm, 70cm, …  More work on  * squeeze is scheduled for APEX tonight.  PASS had gate microswitch problems again (2GE1).  Switched JET from Blue to Yellow.  New Ramp was developed to keep Blue and Yellow beams separated at the JET target. This ramp appears to give reduced polarization in Yellow, and perhaps larger emittance. Reverted to previous ramp.  Power dip on Sunday took most of the day to recover.  Short access on Monday for JET magnet cooler repair, and PHENIX and STAR making minor fixes.

4  APEX begins 8:00PM tonight.  Maintenance begins with Polarized Source Heater off at 7:00AM Wednesday morning for source maintenance.  RHIC access starts at 8:00AM  PHENIX doing MuTr Trigger prototyping  STAR access for PP2PP  AGS Polarimeter Target work  NSRL Experiments start next Monday, 3 March 2008.  Continuing work on NSRL recertification  Backflushing D6 on Maintenance Day

5 Feb 26/ 27APEX/Maintenance Mar 3NSRL starts running Mar 10 pp ends, 8:00 AM Start Low Energy Au-Au running Mar 12RHIC Run 08 ends, 8:00 AM Cryo warm-Up Begins Mar 12Booster/AGS running til midnight

6  RHIC – pp……………..….Christoph MontagChristoph Montag  STAR......................................Bill ChristieBill Christie  PHENIX.................................Mike LeitchMike Leitch  Polarimeter.……………………Haixin HuangHaixin Huang  PP2PP…………………….…….Wlodek Guryn  NSRL…………………………..…Adam Rusek  BLIP…………………….…..Leonard MausnerLeonard Mausner  Operations.…………………….…Fulvia PilatFulvia Pilat

7  Operations……..……….Peter IngrassiaPeter Ingrassia  Sources……………………....…Jim Alessi  Booster and AGS...............Leif Ahrens  Maintenance………….…Paul SampsonPaul Sampson  Expt Support & Facilities…Al Pendzick  Instrumentation……...……..Tom Russo

8  Vacuum..........................Mike Mapes  Cryogenics…………..Andy Warkentien  Power………………………Jon Sandberg  RF................................Alex Zaltsman  Controls...........................John Morris  Access Controls……….Jonathan Reich  RCF………………………....Michael Ernst*Michael Ernst *not present


Download ppt " Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB."

Similar presentations


Ads by Google