Under The Earth
2
Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine Transport (people, waste rock and ore) through: Decline Shaft Decline and Shaft
3
Shaft and Decline www.geocities.com/cannon_mine/
4
Development Create accesses and other openings (water sump, power station, shop etc.) in waste rock. Cycle/Round – Drilling – Blasting – Mucking – Ground Support Basic Terminology – Rib- Side Wall – Sill- Floor – Back- Roof Overhead – Face – Active Working/Advancing Surface
5
Drilling http://news.thomasnet.com/images/large/456/456652.jpg
6
Blasting Load drill holes with explosives and…… ….BOOM!! http://www.cgempire.com/tutorials/pstuts/explosion/ExplosionExample.jpg
7
Mucking http://www.golden-phoenix.com/images/MuckingMaryMine.jpghttp://wells.entirety.ca/images/wp627m.jpg
8
Ground Support: Bolts & Mesh
9
Ground Support: Bolts Prevent wedge failure Hold mesh (wire) http://www.rocscience.com/images/products/unwedge/uw_support5.gif
10
Patterns Several types of bolts used ranging 5 to 12 feet in length Spacing and bolting pattern dependent upon ground conditions and life span of drift
11
® ® weellxS ® weel l x S Different Patterns For 100% Coverage
12
Ground Support: Shotcrete Form a support arch Fill in voids between rocks and bond them together Stop rock weathering
13
Ground Support: Shotcrete http://www.scsmining.ca/site/Portals/0/Shotcreter%20in%20tunnel.jpg
14
Thank you!! Questions?