CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION May 30, 2013 Roger Woodhead PhD, P.Eng Brian McDonnell, P.Eng System Safety Society.

Similar presentations


Presentation on theme: "CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION May 30, 2013 Roger Woodhead PhD, P.Eng Brian McDonnell, P.Eng System Safety Society."— Presentation transcript:

1 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION May 30, 2013 Roger Woodhead PhD, P.Eng Brian McDonnell, P.Eng System Safety Society

2 Main Section Title Page 2 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Agenda 1.Introductions 2.The Project Team 3.Scope of Design and Construction of Confederation Line 4. Scope of Safety Certification 5.Safety Certification Process 6. Who Does What 7. Documentation Flow 8. List of Certificates 9.Certificate Examples from Canada Line

3 Main Section Title Page 3 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION The Project Team Client Rideau Transit Group OLRT Constructors RTG Engineering Joint Venture Rideau Transit Maintenance General Partnership Vehicle and Train Control Suppliers

4 Main Section Title Page 4 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION The Project Team Experienced in dealing with regulatory bodies for urban projects and engaging them during the design, construction and operations and maintenance phases Assisted municipalities with: —Orientation to vehicle and fixed facilities to deal with incidents —Training exercises (smoke tests, evacuation procedures, etc.) Attained Operating Certificate for the Canada Line – first P3

5 Main Section Title Page 5 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Scope of Design & Construction JV Confederation Line Work involves converting a portion of the existing Bus Rapid Transit system (BRT) into a Light Rail Transit system (LRT). The Confederation Line Work involves upgrades at some existing stations, construction of new stations, construction of portions of new track not within the Existing BRT Infrastructure, tunnelling through the downtown core and the construction of a new MSF.

6 Main Section Title Page 6 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Scope of Design & Construction JV - Stations

7 Main Section Title Page 7 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Scope of Design & Construction JV - Tunnel ⋅ Proposed Construction Methodology - SEM Substantial reduction of utility impacts Greater Control over construction methods Reduced traffic impacts Reduced bus operations impacts Reduced business operation impacts More efficient station design Reduced surface excavation

8 Main Section Title Page 8 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Vehicle

9 Main Section Title Page 9 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Vehicle

10 Main Section Title Page 10 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Vehicle

11 Main Section Title Page 11 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Train Control

12 Main Section Title Page 12 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Train Control

13 Main Section Title Page 13 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION Train Control

14 Main Section Title Page 14 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification ⋅ Definition ⋅ The APTA Manual for Transit Safety and Security Certification defines this as: ⋅ The series of processes that collectively verify the safety and security readiness of a project for public use.

15 Main Section Title Page 15 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

16 Main Section Title Page 16 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

17 Main Section Title Page 17 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

18 Main Section Title Page 18 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

19 Main Section Title Page 19 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification Who Does What  RTG/Alstom – Vehicles  RTG/Thales – Automatic Train Control  RTG& City – Communications Systems  RTG – Electrical Systems  RTG – Tunnel Ventilation Systems  RTG – Everything Else, Interfaces, System Integration

20 Main Section Title Page 20 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

21 Main Section Title Page 21 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

22 Main Section Title Page 22 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

23 Main Section Title Page 23 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

24 Main Section Title Page 24 CONFEDERATION LINE PROJECT: TUNNEY’S PASTURE TO BLAIR STATION System-Wide Safety Certification

25 THANK YOU – MERCI