1
We Moved Your Core? What happens when Housing, Greek Life, and Construction Collide Versus? Micheal K. Seraphin Coordinator of Purchasing, Willamette University NWACUHO 2010 February, 8, 2010
2
Why this session? History between Willamette and National Fraternities Commitment on the part of the Willamette Student Input & Involvement Budgeting Master Planning My limitations as the presenter – I was the Area Coordinator for the Fraternities during ¾ of this process, and the Coordinator of Purchasing the other ¼. I do not work in Facilities or Project Management
3
How did Willamette get to this point? G. Herbert Smith – 1927 DePauw University alum President, Willamette University President from 1942-1969 Secretary General, Beta Theta Pi Fraternity, 1935-1946 President, Beta Theta Pi Fraternity, 1946-1951 Fraternities vs. Residence Halls Starting in 1946 – Five national fraternities have been housed on Willamette’s campus ▫Beta Theta Pi ▫Delta Tau Delta ▫Phi Delta Theta ▫ Sigma Alpha Epsilon ▫Sigma Chi
4
The Process Fall 2007Spring 2008/Summer 20008 Breaking the news ▫What the men felt ▫Concerns they had ▫How was the University going to accommodate them? ▫Entitlement issues Finding a new home Controlling the flow of information Meetings, meetings, more meetings More meetings Damage control Preparation Making accommodations Bricks and trees Damages to the facility Saving goodbye
5
Photos - Old Beta Theta Pi 5.30.08
6
Budget – Demolition of “Old Beta” BudgetChangesEncumbrancesExpense to Date (Encum. – Expen.) Over / Under Architectural Fees - HEA Not to exceed $5k $ 5,000.00 $ 4,980.00 $ 20.00 Engineering Fees - BMGP Engineering $ 2,250.00 $ 672.00 $ 1,578.00 Plan Check Fee $ 710.00 $ 709.70 Permits / Development Fees $ 710.00 $ 702.58 $ - General Contractor - HOFFMAN $ 150,000.00 $ - Owner Provided Construction $ 600.00 $ 561.27 $ - Owner Provided FFE's $ - Asbestos / Lead Abatement at BETA Demo $ 30,500.00 $ 5,000.00 $ 35,450.50 $ 30,450.50 $ 5,000.00 De-Commission Power / HVAC / Site Utilities $ 2,000.00 $ 152.20 $ 5,051.40 $ 4,122.04 $ 929.36 Salvage BETA Stoop and Chapter Stuff $ 1,000.00 $ - Temporary Secure Baxter In Hoffman $ - Excavation Fill Hole / Grading / Special Inspect In Hoffman $ - Moving / Storage of BETA Personal Items $ 2,000.00 $ 4,500.00 $ 6,412.44 $ - Total $ 186,810.00 $ 9,652.20 $ 198,178.19 $ 192,248.83
7
Photos - BETA Demo Summer 08
8
Budget – Backfill of “Old Beta” BudgetChangesEncumbrancesExpense to Date (Encum. – Expen.) Over / Under Architect Fees $ 36,000.00 $ 35,000.00 $ 35,227.04 Equip, Furniture $ - $ 4,251.50 Other Costs $ 3,800.00$0.00 Construction $ 7,500.00 $ - $ 6,999.00 Total $ 47,300.00 $ 35,000.00 $ 46,477.54
9
Photos - Beta Theta Pi Backfill
10
Budget - General BudgetChangesEncumbrancesExpense to Date (Encum. – Expen.) Over / Under Architectural Fees $ 100,350.00 $ 25,000.00 $ 125,350.00 $ 115,560.84 $ 9,789.16 Architectural Expenses- Added to budget will change $ 4,990.51 Engineering Fees $ 2,700.00 $ 2,683.40 $ 2,254.40 $ 429.00 Plan Check Fee $ 3,400.00 $ 70.10 $ 3,470.10 $ - Building Permit(s) $ 4,100.00 $ 486.64 $ 4,472.89 $ - Abatement $ 24,000.00 $ (136.00) $ 23,864.00 $ - General Contractor - FORTIS CONSTRUCTION $ 1,137,011.00 $ 87,101.00 $ 1,267,101.00 $ 1,203,745.95 $ 63,355.05 Owner Provided Construction (w/WITS / Security) $ 50,000.00 $ (5,242.12) $ 44,757.88 $ - Owner Provided FFE's $ 25,000.00 $ (24,325.00) $ 675.00 $ - $ (25,000.00) TOTAL: $ 1,351,551.51 $ 57,954.62 $ 1,452,364.78 $ 1,403,791.57
11
Other Construction Costs BudgetChangesEncumbrancesExpense to DatePurpose Entrance Controls $ 565.00 Entrance White Glove $ 510.00 Christensen Electric $ 14,320.50 Technology Fiber JE Fire Watch $ 748.00 Salem Blue $ 82.68 Salem Blue $ 10.10 Salem Blue $ 5.40 River City Excavation $ 19,465.00 Fire Line A-1 Striping Co. $ 360.00 Lowes $ 60.20 Sonitrol $ 1,250.00 Security Fire etc. Sonitrol $ 1,250.00 River City Excavation $ (5,093.00) Total: $ 44.757.88$ 44757.88
12
Photos - New Beta Construction 2008_06_13
13
Total Expenses to Date… $ 1,687,275.82
14
Photos - Beta Theta Pi 2010
15
Things to Consider/Lessons Learned When to bring students into the process Communicating with the rest of the campus Communicating with the other potential students/residential communities Real wants vs. real needs Dealing with inter-organizational communication/issues
16
Thanks for the following: Jan Gardner – Director of Facilities Cindy Anderson – Assistant to the Director of Facilities The Men of the Gamma Sigma chapter of Beta Theta Pi The Men of the Delta Zeta chapter of Sigma Chi
17
Questions ? Micheal K. Seraphin mseraphi@willamette.edu