Download presentation
Presentation is loading. Please wait.
Published byNickolas Wood Modified over 9 years ago
1
Long Range Plan for Technology (LRPT) 2013 Update to Plan 2011-2014
2
Vision Northwest ISD The best and most sought-after school district where every student is future ready: Ready for college Ready for the global workplace Ready for personal success
3
NISD LRPT Tech plans are on a three-year cycle with annual revisions: 2011-2014 Current plan 2015-2017 Planning in progress Key Areas: Teaching & Learning Educator Preparation & Development Administration & Support Infrastructure
4
2013-2014 Major Accomplishments Closed 8,969 help desk tickets from July 4, 2013 to April 9, 2014 Deployed 8,780 devices to students Deployed 1,343 tablets to teachers Deployed 1,583 laptops to teachers Deployed 90 iPad Minis to the OLC Upgraded 29 central office computers 20,989 Email accounts Processed over $396,000 in 1:1 insurance and device fees
5
Professional Development Technopalooza –Operating system (Window 8 & iOS) –Using the tablet for learning Atomic Learning –24 x 7 instructional videos –Windows 8 –iOS 6
6
Professional Development Summer Professional Development –Targeted instruction for tablet devices in the classroom iPad Academy New Teacher Boot Camp Technology Integration Academy On site teacher training as devices deployed on campuses
7
Teacher Device Standard Dell Latitude 7440 Utrabook Laptop Tablet: –Secondary: Dell Latitude 10 Tablet with case –Elementary: Apple iPad Docking Station External Keyboard/Mouse Document Stand Laptop Bag
8
Student Device Standard Dell Latitude 10 Tablet with case/keyboard Or, Dell Venue 11 Tablet with case/keyboard
9
LRTP Student Standard DescriptionTimeline HS Tablet Growth PrepSummer MS Windows Tablet Deployment Normal distribution: Registration, and first week of school. Elem. 5 th Grade Windows Tablet CartsSummer
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.