Download presentation
Presentation is loading. Please wait.
Published byAriel McDowell Modified over 9 years ago
1
1 Workshop Plan & Activities NWCSAF Users’ Workshop, Madrid 24-26 February 2015 Pilar Rípodas AEMET
2
P. Rípodas 2 Practical things The coffee breaks: mornings in the canteen afternoons in the reception area Lunch in the canteen at 12:30 (menu in English, Photograph on Tuesday before lunch, Thursday?). Posters will be in the reception area. If you have a presentation, please contact us. The “Press room” is available for small working groups, if necessary. There are sockets available on the floor. WIFI connection: AEMETSA, password: 0011223344 SOCIAL EVENT. Tuesday at “Museo Sorolla”: visit to the museum followed by a cocktail. Two buses will take us to the museum at the main entrance at 18:00 – 18:10 WS room Canteen Reception Desk Main entrance Press Room Toilets
3
P. Rípodas 3 OBJECTIVES To assess the current status of the project To assess the applicability and usefulness of the NWC SAF products in the current phase (CDOP-2) To revise the proposals for further developments To collect the user requirements for the next phase (CDOP-3) with special focus on MTG and EPS-SG
4
P. Rípodas 4 Workshop Plan Welcome. Introduction Presentations from EUMETSAT: SAF Network MTG Program: MTG-FCI, MTG-LI, MTG-IRS EPS-SG Observation mission GEO Package and PPS package overviews GEO operations and PPS operations Developers presentations: Description CDOP-2 Evolution CDOp-3 Perspective Users Presentations Users Survey Results Open discussion: Users Requirements
5
P. Rípodas 5 User Requirements Collection 4 Easel have been set with white paper in order to: Allow the Workshop Attendants to write on them Everybody is invited to participate contributing with new ideas about the CDOP-3 NWC SAF My best wishes for a rich, fruitful and successful Workshop GEO ScienceGEO EngineeringPPS SciencePPS Engineering
6
P. Rípodas 6 THANK YOU FOR YOUR ATTENTION
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.