Presentation is loading. Please wait.

Presentation is loading. Please wait.

GT Transport Infra structure map " ملتقى التنمية المتكاملة لمنطقة المثلث الذهبي " Comprehensive Development of the Golden Triangle Area for Mining " ملتقى.

Similar presentations


Presentation on theme: "GT Transport Infra structure map " ملتقى التنمية المتكاملة لمنطقة المثلث الذهبي " Comprehensive Development of the Golden Triangle Area for Mining " ملتقى."— Presentation transcript:

1 GT Transport Infra structure map " ملتقى التنمية المتكاملة لمنطقة المثلث الذهبي " Comprehensive Development of the Golden Triangle Area for Mining " ملتقى التنمية المتكاملة لمنطقة المثلث الذهبي " Comprehensive Development of the Golden Triangle Area for Mining

2 “Introduce the Golden Triangle project activities from Inception till now” DAY 1 – OPENING SESSION

3 To create a cohesive territory in which people can grow up with the opportunity to enhance their social, environmental and economic well- being, in a sustainable ecosystem contributing to Egypt’s ambition to be well positioned to join the ranks of the world’s upper medium-income countries. OUR VISION

4 OUR APPROACH ASSESSMENT DESK MEETINGS/ WORKSHOPS FIELD PUBLICATIONS SWOT KPI VISION SECTOR OBJECTIVES GAP POTENTIAL CONCEPTS FOR GT OBJECTIVES AND BASELINE DATA STRATEGY

5 Inception phase: 7th May - 6th June 10 -11 May, visited EMRA 12 -28 May: FIRST FIELD VISIT Baseline Data and objectives phase: 7th May - 5th August 22 - 25 June, visited EMRA 26th June - 31st July SECOND FIELD VISIT MAY-SEPTEMBER 2015: GT ACTIVITIES

6 More than 200 working days on the field More than 70 Entities met More than 8000 km covered in the Golden Triangle Inception: completed Objectives and Baseline data: draft report submitted Development Strategy Master Plan Development Action Plan Pilote Phase Socio Economic and Environmental Assessment THE GT Project EFFORT

7 Geology for GT project To prioritize the assessment of the potential of each kind and group of important minerals, especially in geological settings with mineral prospect in GT survey area and neighboring so as to clarify the potential of each kind of mineral to serve mineral exploration, exploitation, processing and use of reasonable national mineral reserves.

8 V IEW OF A BANDONED G OLD P ROCESSING P LANT FROM W ADI F LOOR Gold

9 P ORTAL OF A BANDONED P HOSPHATE M INE C ONVEYOR G ALLERY Phosphate

10 F OUNDATIONS OF A BANDONED M ETALS P ROCESSING P LANT Metal Plant

11 D AYLIGHTED S TOPE ON Q UARTZ V EIN E XTENSION OF V EINING AND M INING Wadi Umm Esh serpentinite quarry

12 Private/Public: Quadruple Helix model I NNOVATION MODEL INVOLVING INSTITUTIONAL BODIES, RESEARCH SPHERE, BUSINESS SECTOR AND CITIZENS IN THE PROCESS.

13 Quadruple Helix model

14 Phasing strategy TECH ANALYSISFIN ANALYSIS INTEGRATED DEVELOPMENT MODEL MITA PRIORITIES

15 D’Appolonia S.p.A. - AN ISO 9001 AND ISO 14001 CERTIFIED COMPANY - www.dappolonia.it “ Development that meets the needs of the present without compromising the ability of future generations to meet their own needs is sustainable development ” (High Level Panel on Global Sustainability, United Nations 1989).


Download ppt "GT Transport Infra structure map " ملتقى التنمية المتكاملة لمنطقة المثلث الذهبي " Comprehensive Development of the Golden Triangle Area for Mining " ملتقى."

Similar presentations


Ads by Google