4/22/2017 10:10 PM Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico This is a recent picture.

Similar presentations


Presentation on theme: "4/22/2017 10:10 PM Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico This is a recent picture."— Presentation transcript:

1 4/22/ :10 PM Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico This is a recent picture of the BRAC facility. Note Russell Road in the top left corner of the picture and Telegraph Road in front of the facility. The bypass from Russell Road to the BRAC facility is visible in the top left portion of the picture. The rectangle white structure is the logistics building. The main Military department Investigative Agencies (MDIA) building consists of two wings (four stories) and the center entrance way. The facility is 719,000 square feet. The building site is approximately 100 acres.

2 MCB Quantico MCB Quantico 4/22/2017 10:10 PM
This map provides an overall orientation for the location of the BRAC site on the west side of MCB Quantico, one mile west of I-95.

3 4/22/ :10 PM MDIA Project Overview Relocate Military Defense Investigative Agencies (MDIA) from current locations and co-locate at MCB Quantico by 15 Sep 2011 Defense Security Service (DSS) – Alexandria, VA Joint Counter Intelligence Academy Elkridge MD Elements of Defense Intelligence Agency (DIA) Crystal City, VA Naval Criminal Investigative Agency (NCIS) Washington Navy Yard, Washington D.C. Army Criminal Investigation Command (CID) Fort Belvoir VA Air Force Office of Special Investigations (AFSOI) – Andrews AFB, MD Positions relocating – 2767 Student – 200 average daily student load Construction Project $312 Million NAVFAC MILCON Construction Company Hensel Phelps Construction Co. Facility Location west side of Base, 1 mile west of I-95 100 Acres secure compound, 2600 Parking Spaces Headquarters Complex, Training, Logistics, Security Sensitive Compartmented Information Facilities ATFP Compliant LEED Silver Fitness Center Cafeteria Base Infrastructure Widen Russell Road to four lanes from Interstate to BRAC Site Bypass from Russell Road to MDIA site Interstate I-95 Interchange 148 Ramp Improvements Improvements to Ponderosa Y Gate West Side This side provides an overview of the MDIA BRAC project.

4 DESIGN/BUILD CONSTRUCTION
4/22/ :10 PM BRAC Timeline FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 Sep 15, 2006 Sep 15, 2007 Sep 15, 2008 Sep 15, 2009 Sep 15, 2010 Sep 15, 2011 Sep 15, 2005 TODAY NEPA STUDY/EIS RFP/ 10% DESIGN DESIGN/BUILD CONSTRUCTION RELOCATION The key point of this slide is the construction will be completed in late December 2010 allowing sufficient time for building security certification and phased relocation to meet the BRAC deadline of September CLOSE-OUT CURRENT LOCATIONS

5 MDIA Building Interior

6 MCB Quantico Road Improvements
4/22/ :10 PM MCB Quantico Road Improvements The primary traffic impact associated with the MDIA BRAC action will be at the Base access points as 2767 commuters converge daily to access the BRAC site. Most traffic will access the BRAC site from Interstate I-95 at exit 148 onto Russell Road. To move that traffic off of I-95 to the BRAC site the following traffic mitigation work is being done as part of the BRAC construction: -The I-95 Ramps are having additional turn lanes added. Normally, all Interstate work would be done by the Federal Highway Administration (FHWA) and Virginia Department of Transportation (VDOT) However, the ramps at exit 148 are unique in that they are on MCB Quantico property. Under the terms of the land use agreement the Marine Corps can make improvements to those ramps with the concurrence of FHWA/VDOT that their engineering standards have been met. MCB Quantico has applied for and received approval to make the Ramp improvements. MCB Quantico has also submitted a Defense Access Roads (DAR) package for additional ramp extension should additional Base growth require furtherl ramp extensions to allow safe merge of traffic on the ramps and onto the main roadway. -Signals at the intersection of I-95 Ramps and Russell Road to synchronize traffic movement. -Widening of Russell Road from 2 to 4 lanes from I-95 to the BRAC site. -Construction of a short bypass from Russell Road into the BRAC site. -Improvement to the MCB Quantico west side gate to allow more lanes of traffic through the gate to prevent backups on Russell Road that would impede BRAC traffic.

7 MDIA Demographics Currently reside in commuting area (51%)
Commuting area defined as Virginia Remaining 49% Currently surveying employees Many are undecided and keeping options open Commute from Maryland/DC Relocate or leave position Migration is underway

8 4/22/ :10 PM Questions?


Download ppt "4/22/2017 10:10 PM Base Realignment and Closure (BRAC) Military Department Investigative Agencies (MDIA) Co-Locate at MCB Quantico This is a recent picture."