BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.

Similar presentations


Presentation on theme: "BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood."— Presentation transcript:

1 BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood Executive Director Ouachita River Valley Association 1

2 ORVA HISTORY 1893 – “Ouachita River Improvement Association” 1950 – “Ouachita River Valley Association” 2

3 AREA OF OPERATION 3

4 ORVA MISSION Non-profit organization that promotes development of water and land resources Major focus is on operation, maintenance and completion of Ouachita-Black Rivers AR and LA, Navigation Project Represent the private sector of the economy 4

5 ORVA ORGANIZATIONAL STRUCTURE OFFICERS BOARD OF DIRECTORS STAFF - President - Louisiana – 7 -Executive Director - Vice President - Arkansas – 7 - Sec./Treasurer GENERAL MEMBERSHIP REVENUE 100 + 5

6 PROJECT/STUDY 1. Ouachita-Black Navigation Project, Red River to Camden, AR 2. Ouachita-Black Navigation Project, Red River to Camden, AR – Bank Stabilization 3. Ouachita-Black Navigation Project, Red River to Camden, AR – Little River Addition 4. Ouachita River Levees, LA 5. Arkansas Lakes - Ouachita, DeGray, and Greeson 6. Ouachita River Watershed Study, AR and LA ORVA SUPPORTED STUDIES/PROJECTS OUACHITA RIVER BASIN, AR AND LA 6

7 Ouachita-Black Navigation Project 7

8 8

9 9

10 10

11 Red-Ouachita Basin Levees, Louisiana 11

12 12

13 Ouachita River Watershed 13

14 OUACHITA-BLACK WATERWAY SYSTEM “MUCH MORE THAN NAVIGATION” 14

15 OUACHITA-BLACK RIVERS NAVIGATION PROJECT FUNDING (in millions) FY 2006-2010 FY FY FY FY Avg. 2011 2012 2013 2014 $10.9 $7.5 $7.4 $7.5 $9.7 $3.2 supplemental $10.6 15

16 Dredge Butcher Conducting Dredging Operations on the Ouachita River $3.2 Million Needed Annually for Dredging Operations 16

17 INLAND MARINE TRANSPORTATION SYSTEM STUDY GUIDELINES TABLE 17

18 REDUCTION IN OPERATIONAL SERVICES OUACHITA-BLACK RIVERS NAVIGATION PROJECT -Effective July 29, 2012 - 3 shifts to 2 shifts - Jonesville and Columbia Locks & Dams – 18 hrs. daily -Felsenthal & Thatcher Locks & Dams – 16 hrs. daily August 1, 2013 - Jonesville and Columbia Locks & Dams – 20 hrs. daily - Felsenthal & Thatcher Locks & Dams – No Change - FUTURE – Jonesville and Columbia – Back to 24/7/365 -Felsenthal and Thatcher Lock and Dams – Based on IMTS Criteria After Installation of Remote Control 18

19 OUACHITA-BLACK RIVERS NAVIGATION PROJECT IMTS IMPACTS (July 29, 2012 – July 29, 2013) No. of Commercial Lockages No. of Tows Delayed Average Delay Time Total Delay Time Direct Financial Loss 8751271.75 hours220.8 hours$66,200 ---------------------------------------------------------------- - Shippers Incurring Delays/Financial Losses - One out of seven tows being delayed/15 percent - Recreational craft lockages down 50-60 percent - No new industries located on Ouachita-Black Rivers 19

20 RECENT POSITIVE DEVELOPMENTS OUACHITA-BLACK RIVERS NAVIGATION PROJECT, AR & LA -Operational Hours Increased at Jonesville/Columbia L&D -2013 Tonnage Exceeds 1 mil. -Significant New Fuel Shipment by Genesis Energy/Placid Refining Co. -TETRA Technologies Growth -Hydropower Initiative 20

21 TONNAGE OUACHITA-BLACK RIVERS NAVIGATION PROJECT, AR & LA YEARTONNAGE 20001,476,000 20032,198,000 20062,029,000 20091,283,000 2011 942,547 2012 955,000 20131,023,000 21

22 22 FUEL BARGES UNLOADING RED RIVER TERMINAL, MONROE DIVISION GENESIS ENERGY

23 TETRA TECHNOLOGIES, INC. BARGE SHIPMENTS* CROSSETT, ARKANSAS 20118 201221 201330 201448 *Typically each barge holds 1,400 tons 23

24 24 HYDROPOWER DEVELOPMENT INITIATIVE OUACHITA/BLACK RIVERS NAVIGATION PROJECT, AR & LA COMPANY FREE FLOW POWER BOSTON, MA STRUCTURES (L&D’s) - Jonesville L&D Study in Process - Columbia L&D Permit Applied For - Felsenthal L&D Study in Process - H. K. Thatcher L&D Under Consideration

25 ORVA Semi-Annual Congressional Visits 25

26 26

27 27

28 ORVA Meets With Senior USACE Officials 28

29 ORVA Briefs MRC During High and Low Water Inspections 29

30 ORVA’S 49 TH ANNUAL CONVENTION August 26-27, 2014 West Monroe, LA Convention Center West Monroe, LA Photos of West Monroe, LA Convention Center 30

31 ORVA 2014 ANNUAL CONVENTION AUGUST 26-27, 2014 WEST MONROE, LA PRINCIPAL FEDERAL SPEAKERS - Senator David Vitter - BG Duke DeLuca, Commander, MVD - Congressman Vance McAllister - COL John Cross, District Engineer STATE SPEAKERS -State Representative Karen St. Germain, Chairperson, House of Representatives Transportation Committee -Robert Barham, Director, LA Dept of Wildlife and Fisheries -Garrett Graves, Office of the Governor, LA Coastal Restoration -PRIVATE SECTOR SPEAKERS -Dr. Keith Ouchley – LA Nature Conservancy 31

32 32

33 33

34 CONCLUSIONS: 1.NAVIGATION PROJECT FACES DIFFICULTY 2. THINGS ARE IMPROVING 3. NEED MVD/MRC SUPPORT - Keep Projects Viable - Obtain Authorization 4. ORVA’S POSITION - Fully Funded Navigation Project ($11 Million annually) - Operate Navigation Project 24/7/365 5. ORVA will “Stay in Fight” 6. Thanks 34