Green Partnerships Local Partnerships for Greener Cities and Regions 4th SC Meeting Sarajevo, 4 th -7 th February 2014 EWG: Public Lighting.

Similar presentations


Presentation on theme: "Green Partnerships Local Partnerships for Greener Cities and Regions 4th SC Meeting Sarajevo, 4 th -7 th February 2014 EWG: Public Lighting."— Presentation transcript:

1 Green Partnerships Local Partnerships for Greener Cities and Regions 4th SC Meeting Sarajevo, 4 th -7 th February 2014 EWG: Public Lighting

2 Green Partnerships Sarajevo, 4 - 7 February 2014 2 EWG Coordinator and Member Public Lighting Coordinator: AREANATejo Main tasks: 1.Plan, monitor and report the activities/outcomes 2.Assign an expert 3.Define the topics to be addressed to each thematic area; 4.Organise the work schedule between the EWG members; 5.Coordinates the quality control of the compiled materials (external expert) 6.Plan and coordinate the specific working group workshops (if any) 7.Collect 1 best practice example per EWG member (Coordinator and Members); 8.Support the capacity building workshops, if required, in cooperation with the national/regional leaders (articulation with WP4);

3 Green Partnerships Sarajevo, 4 - 7 February 2014 3 EWG Coordinator and Member Public Lighting Members: Granollers City Council Technical University of Crete Main Tasks: 1.Contribute to the definition of the topics to be addressed in each thematic area 2.Responsible to develop the assigned part of the training material for the specific thematic area to be used at the capacity building workshops; 3.Collect 1 best practice example using the template provided, and send it to EWG Coordinator; 4.Prepare, together with the EWG Coordinator, guidelines for developing appropriate training courses, based on the outline proposed by the WP4 leader 5.Contribute to the quality control of the compiled materials 6.Participate at joint and specific EWG workshops

4 Green Partnerships Sarajevo, 4 - 7 February 2014 4 Main topics to be worked 1. Introduction – Importance of efficient public lighting 2.General Definitions 2.1.Human vision 2.2.Luminotecnia 2.3.Eletrotecnia 2.4.Maintenance

5 Green Partnerships Sarajevo, 4 - 7 February 2014 5 Main topics to be worked 3.Classification of roads 3.1. Typology of roads 3.2. Pedestrian urban areas 3.3. Semi-urban areas 3.4. Conflict zones 4.Main determinants of lighting in public places 5.Environmental implications of lighting – Light pollution

6 Green Partnerships Sarajevo, 4 - 7 February 2014 6 Main topics to be worked 6. Measures to improve energy efficiency 6.1. LED 6.1.1. What is LED technology? 6.1.2. Colour temperature 6.1.3. Colour rendering index 6.1.4. Sizing 6.2.Flow regulation systems 6.2.1. Operation 6.2.2. Equipment typologies 6.2.3. Sizing 6.3.Remote management systems 6.3.1. Operation 6.3.2. Equipment typologies 6.3.3. Sizing

7 Green Partnerships Sarajevo, 4 - 7 February 2014 7 Main topics to be worked 7. RES for Public Lighting 8.Case Studies 8.1.AREANATejo 8.2.Granollers City Council 8.3.TUC

8 Green Partnerships Sarajevo, 4 - 7 February 2014 8 Indicative training courses outline Target Audience: Municipalities, technicians, decision makers Learning objectives: general definitions of light and it characteristics of public lighting infrastructures, energy efficiency measures Knowledge/Skills/Competences to be addressed: Analysis of the reference scenario, identify improvement measures, sizing solutions. Duration: to be defined Course: classroom or e-learning Training materials: manual, PPTs, articles Training approach/methods and tools: to be defined Facilities/infrastructure: to be defined Trainers profile Train the trainers activities Evaluation – Reporting

9 Green Partnerships Sarajevo, 4 - 7 February 2014 9 Proposal of task distribution AREANATejo Preparation on all the templates of the materials Contents in charge: General Definitions Flow Regulation Systems Collect one case study and fulfil the template Gather all the case studies Granollers Contents in charge: Classification of roads LED Collect one case study and fulfil the template TUC Contents in charge: Light pollution Remote management systems Collect one case study and fulfil the template

10 Green Partnerships Sarajevo, 4 - 7 February 2014 10 Expected outputs PDF with important data taking into account the main topics to be worked – to support the local/regional capacity building workshops (to be implemented by WP4) PPT with general data taking into account the main topics and to be used during the capacity building workshops 1 case study per EWG Member (AREANATejo, Granollers and TUC) to be included in Library of Best Practices General contributions to the Step by Step Guide (to be sent to the WP3 Leader) 1 Article in EN to be translated and to be uploaded in the website Other relevant materials taking into account the agreements in SC Meetings and EWG Meetings

11 Green Partnerships Sarajevo, 4 - 7 February 2014 11 Timeplan 201320142015 111212345678910111212345 Plan and coordinate the EWG workshops to be held during the SC Meetings Prepare proposal of work plan for each EWG and send it to WP leaders 27 th January 2014 Prepare the materials for EWG work (preparation of structure of the EWG materials, initial materials, agreement on responsibilities of EWG members 31 st January 2014 Training materials development – Final Versions 4 th April 2014 Review of the EWG training materials by the Quality Control Committee 21 st April 2014 Training deliverables finalised/published 30 th April 2014 Collect all the best practices (36) and include them in the Library of Best Practices (LBP) 14 th March Upload of all Best Practices examples in the website 30 th March 2014 Prepare the final structure of the LBP – Final Version 11 th April 2014 Coordinate the tasks of all EWG (Coordinators and Members)

12 Green Partnerships Sarajevo, 4 - 7 February 2014 12 THANK YOU! CONTACTS AREANATejo E-mail: info@areanatejo.ptinfo@areanatejo.pt Website: www.areanatejo.pt Tel.: (+351) 245 309 084 Tiago Gaio (Manager): tiago.gaio@areanatejo.pttiago.gaio@areanatejo.pt Ana Lacão (Financial & Dissemination):ana.lacao@areanatejo.ptana.lacao@areanatejo.pt Hélia Pereira (Technical): helia.pereira@areanatejo.pthelia.pereira@areanatejo.pt Hugo Saldanha (Technical): hugo.saldanha@areanatejo.pthugo.saldanha@areanatejo.pt


Download ppt "Green Partnerships Local Partnerships for Greener Cities and Regions 4th SC Meeting Sarajevo, 4 th -7 th February 2014 EWG: Public Lighting."