Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.

Similar presentations


Presentation on theme: "Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility."— Presentation transcript:

1 Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility and review of housing plan for EZIBELENI INFORMAL SETTLEMENT 200

2

3 Feasibility and Review of Housing Plan EZIBELENI INFORMAL SETTLEMENT 200 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: 021 424-5022 Fax: 021 424-6837 Kantey & Templer PO Box 15087, Beacon Bay, 5205 Tel: 041 373-0738 IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: 021 853-3902 EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS 31-33 Phillip Frame Road Chiselhurst Tel: +27 (0) 43 711 9735 LUKHANJI LOCAL MUNICIPALITY Private Bag X7111, Queenstown, 5320 Tel: (045) 807-2606 Fax: (045) 807-2637

4

5 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9 Future plans of other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1Ownership Annexure 2Title Deed Annexure 3S.G. Diagram

6 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS BLMCBiodiversity Land Management Class CBACritical Biodiversity Area CRUCommunity Residential Unit ECBCPEastern Cape Biodiversity Conservation Plan ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

7

8 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 8 INTRODUCTION 2.1 2.1.1PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Ezibeleni Informal Settlement 200 as a Human Settlement Project and to recommend whether it should be approved or not. 2.1.2BACKGROUND TO THIS REPORT This report is one of twelve Human Settlement Project feasibility reports for Lukhanji Municipality. It is designed so that it can be part of a single document that includes the other eleven projects. 2.1.3TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Awaiting Title Deed Property Description: Portion of Erf 1695, Ezibeleni Title Deed Restrictions:Title Deed to be requested to Deeds office King Williams Town (See Annexure 2) Servitudes: None (See Annexure 3) Site Size:21.41 Ha The Ezibeleni Informal Settlement project is an urban greenfield project on an existing general plan located in Queenstown within Lukhanji Municipality. The Ezibeleni Informal Settlement 200 project is situated at the foot of a gradual mountain slope on the east boundary of the Ezibeleni. Ezibeleni is Queenstown’s largest township, situated approximately 6km east of Queenstown on the east border of Lukhanji Municipality. It is setback approximately one kilometre from the N6. It takes access off this route about six kilometres from Queenstown. It was designed as a dormitory suburb of Queenstown, although an industrial area was planned on its western border and was partially developed. Queenstown is the main administrative, commercial and educational centre of Lukhanji Municipality and surrounding farms. It is located approximately 188km north of East London and 165km south of Aliwal North on the N6 national road, see Figure 2.1.1 Portions of the site have been invaded by informal dwellers, hence its name. However, the area has not be entirely transformed. The site is vacant, with no services and roads and approximately 22 dwellings located on it.

9 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 9 Locality Plan Figure 2.1.1

10 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 10 Aerial Photograph Figure 2.1.2

11 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 11 VISUAL SURVEY Figure 2.1.3 a. A view of the north portion of the site.b. Informal dwellers settled centrally on the western boundary of the site.c. A view of the southern portion of the site. d. Informal dwellers situated on the eastern edge of the site on the foot of the mountain.e. Informal dwellers situated on the eastern edge of the site on the foot of the mountain. f. Fenced off informal shack with tree and flower planting. g. The bridge crossing the water course on the western site boundary.h. Water reservoirs north of the sitei. Informal shacks north of the site on the foot of the mountain.

12 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 12

13 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 13 STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2 200 subsidies have been proposed for Ezibeleni informal Settlement. These units will comprise project linked subsidy onto and existing greenfield site. The site allows for more subsidies than envisaged for the project. Approximately 295 plots at 450m² per erf can be accommodated on the 21 Ha site. The project allows for 95 additional subsidies. There 1010 beneficiaries on the waiting list for Ezibeleni. They are still to be verified. The number of beneficiaries on the waiting list supports the proposal to provide additional subsidies for the area. EZIBELENI INFORMAL SETTLEMENT 200 Population (Lukhanji SDF 2005)N/A Population (2011 Census)N/A Ex. Units (Lukhanji SDF 2005)N/A No. Households (Census 2011)N/A Proposed Units (EC DHS)200 Waiting List (Lukhanji LM)1010 still to be verified Figure 2.2.1Statistical Background

14 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which Ezibeleni Informal Settlement is located is Erf 1695, Ezibeleni. The area has been subdivided and is marked out on General Plan No. T 871, with 19 G.P. sheets, of which the site is shown on sheet 16 and 17, see Annexure 3. On Sheet 16 the site comprises erven 6537 – 6653 (117 erven) and a public place Erf 6536. On sheet 17 it comprises erven 6654 – 6695, 6697 - 6717, 6719 – 6832 (178 erven) and public places Erven 6696 and 6718. The G.P was registered at the Surveyor - General in 14/01/1991. It appears however that the erven have not yet been registered with the Deeds Office. The ownership print out advises further queries to be directed to the Registrar of Deeds, see Annexure 1.

15 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 15 Cadastral Layout Figure 2.3.1

16 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

17 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 17 Engineering (Kantey and Templer) Figure 2.4.1

18 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 18 ENVIRONMENT 2.5 The site is situated at the foot of gradual north facing mountain slope. The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP. This must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project. BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas. However, it can be seen on Fig. 2.5.1 that CBA 2 is shown as extending over most of the urban areas of Ezibeleni. This is clearly incorrect and the mapping of CBA 2 in this vicinity has not been ground-truthed and amended. There is a water course that flows through the northern portion of the site, abutting the site boundary. It flows from the mountain, in a westerly direction, see Fig. 2.5.1. The watercourse continues to flow west, across the road according to the mapping, however once it reaches the western boundary it flows south along the boundary, see Fig 2.1.3 (g). It affects site access as it abuts the only street boundary. It also requires effective storm water drainage. Housing development needs to ensure that it remains 32m from the river or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). The requirement for 32m from a river or watercourse has been taken into account. This can be seen in the subdivision payout, see Figure 2.5.1.

19 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 19 Environment Figure 2.5.1

20 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 20 GEO-TECH (Kantey and Templer) 2.6 Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is suitable for further development of these areas. Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. In terms of the geotechnical information available, the proposed housing projects appear to be feasible and planning should proceed with further investigations on individual sites. (Outeniqua Geotechnical Services cc, 2013 )

21 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 21 Geo-tech (Kantey and Templer) Figure 2.6.1 Study Area

22 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 Using 1 km walking distance as a measure of efficiency when it comes to accessibility or proximity to social facilities. The following can be found in Ezibeleni Informal Settlement: There are three primary schools located west of Ezibeleni Informal settlement within 1 km walking distance. A number of intermediate schools as well as a secondary school can be found with in a 2 km distance. The clinic is located approximately 2 km west of the site, see Fig 2.7.1 The Police station is located just west of the clinic approximately 2.5km west of the site, see Fig 2.7.1. Social facilities are adequately provided in Ezibeleni. This proposed Human Settlement Project will not require provision of additional facilities.

23 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 23 Distribution of Social Facilities Figure 2.7.1

24 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 According to the 2005 SDF Ezibeleni informal settlement is within the urban edge, see Fig. 2.8.1. The SDF plan proposes the site be developed for residential purposes, see Figure 2.8.1. Recreation purposes are proposed on land abutting the water course on the north as well as the stormwater drainage channels on the western boundary of the site see, Fig 2.8.1. The proposed Human Settlement Project is in line with the SDF

25 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 25 Current Spatial Development Framework Figure 2.8.1 The Site

26 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP 2013-2014. The IDP 2013-2014 proposed the upgrading of sanitation infrastructure to the value of R 18.9m, a portion of which will be attributed to the Ezibeleni human settlement project.

27 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 27 APPROVAL BY COUNCIL 2.10 The Council Resolution is still awaited from the Municipality.

28 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 28 SUMMARY AND RECOMMENDATIONS 2.11 2.11.1SUMMARY The site was inspected on 25/10/2013 and the conclusions below ground-truthed. There are adequate engineering services. (K&T to confirm) In Terms of ECBCP BLMCs that apply to CBA 2, settlements are not recommended. However, the extent of the CBA 2 in and around Ezibeleni is clearly inaccurate as it is indicated as covering all of the developed areas. It is recommended that the site be assessed by a Botanist to ground-truth the extent of CBA 2 on the site prior to the commencement of the Human Settlement Project. It is unlikely that an EIA will be required. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The waiting list has been requested from the municipality and is still awaited from this municipality. There are no new social facilities required to support the proposed human settlements project. The Human Settlement Project is in line with the SDF. The Council Resolution is still awaited from the municipality. 2.11.2RECOMMENDATIONS The project is feasible, pending an assessment by a botanist to ground- truth the extent of CBA 2 in Ezibeleni Informal Settlement. Depending on the outcome of this assessment which must take into consideration that the land has already been planned and subdivided, it is recommended that the award of subsidies can proceed in Ezibeleni Informal Settlement.

29 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 29 ANNEXURE 1: OWNERSHIP PRINTOUT

30

31 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 31 ANNEXURE 2: TITLE DEED

32

33 EZIBELENI INFORMAL SETTLEMENT 200 FEASIBILITY STUDY CNdV africa (Pty) Ltd3 October 2015 page 33 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

34

35

36


Download ppt "Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility."