Download presentation
Presentation is loading. Please wait.
Published byChester Fox Modified over 9 years ago
1
NCSA GROUND OPERATIONS AND FIELD MANAGER RESPONSIBILITIES GLIDER TIE DOWN CART OPERATIONS COMMUNICATIONS GLIDER TIE DOWN CART OPERATIONS COMMUNICATIONS
2
DELIGATE ANTICIPATE COMMUNICATE
5
KNOTS Use only two knots – bowline and Rich Miller knot. All knots on cable. No single lines, airmen’s hitches, trucker’s hitches. All tie down points get a backup. Except single line for tail, half hitch for keeper. Use only two knots – bowline and Rich Miller knot. All knots on cable. No single lines, airmen’s hitches, trucker’s hitches. All tie down points get a backup. Except single line for tail, half hitch for keeper.
6
RICH MILLER BLANIK TAIL TIE DOWN (VIDEO)
7
GLIDER TOWING AND RETRIEVING A2 A3
8
CART & GLIDER PARKING
9
“FIRST TURNOFF”
11
RUNWAY 23 OPS
12
COMMUNICATIONS LAUNCHING Traffic --To power aircraft: “Power aircraft on downwind, Byron Glider Ground, can you extend downwind for glider launch?” Start engine Take runway: “Byron traffic, Byron Glider Ground, glider taking runway three zero for tow plane hookup. Take off: radio call from glider. LAUNCHING Traffic --To power aircraft: “Power aircraft on downwind, Byron Glider Ground, can you extend downwind for glider launch?” Start engine Take runway: “Byron traffic, Byron Glider Ground, glider taking runway three zero for tow plane hookup. Take off: radio call from glider.
13
COMMUNICATIONS LANDING To glider: “Glider 81C, Byron glider ground, advise second turn off” To tow plane: “Tow Plane 16 Yankee, Byron glider ground, glider ready to launch, hold on runway, traffic permitting.”
14
THANKS FOR FLYING WITH NCSA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.