2
Faculty Technical Advisor: Dr. Kambiz Farhang Team Members: Seth Carter, ME (PM) ▪ Valve & Bolt System James Morrow, ME ▪ Marker Body Bryson Orr, ME ▪ Feed System Client: Jake Myers, Owner of Saltfork Paintball
3
Executive Summary (SC) Project Background List of Deliverables Discussion Literature Review Summary (BO) Project Description (BO) Plan to Complete Project (JM) ▪ AIL ▪ RASI Chart ▪ Spring Timeline Resources Needed (JM) Summary (SC)
4
Upgrade Industry Standard Industry standard is outdated Players demand better performance Combine Best Components Rare valve/feed system combination Less than $250 in material costs
5
Deliverables: Drawings and FEA data Working Prototype Prototype Test Data Manual
6
Overview of Rules and Regulations for Play Maximum Paintball Velocity 300 ft/s (FPS) Semi-Automatic Types of Paintball Markers Poppit Valve Spool Valve Types of Feed Systems Gravity ▪ Maximum 8 paintballs per second (BPS) Agitated ▪ Maximum 12-15 BPS Force Feed ▪ 15+ BPS
7
Players Needs Accuracy Reliability Speed Weight Price Owners Needs Durability Reliability Maintenance Time Maintenance Cost Clients Solution Tippmann 98 Custom
8
Create a marker that satisfies the players wishes while meeting Saltfork Paintball’s needs. Spool Valve Increases Accuracy Integrated Mechanical Force Feed System Increases Speed while keeping Maintenance Time and Cost Low. Frame Size and Material Stress Analysis to Reduce Frame Size, Decreases Weight
12
Proposed Timeline Spring ‘11
13
ItemQty.Price Delrin rod1$2.24 Aluminum Block1$75.62 HPA TankBorrowed$0.00 Marker BarrelBorrowed$0.00 HPA Regulator1$50.00 Hopper1$10.00 ABS Plastic$50.00 Misc. (Bolts, springs, o-rings, etc.) $50.00 ComputerOn Hand$0.00 Autodesk Inventor SoftwareOn Hand$0.00 ANSYS SoftwareBorrowed$0.00 Microsoft Office SoftwareOn Hand$0.00 Total$237.86 Machining costs will increase this total, but cannot be accurately estimated until further design work is completed.
14
Project Overview Valve System Feed System Plan To Finish On Time Follow Timeline AIL’s Resources Needed Computer Software Materials Machining