Download presentation
Presentation is loading. Please wait.
Published byMavis Cummings Modified over 9 years ago
1
Woodrow Wilson High School Washington, D.C. Projects in the Design Phase Design Concept Award cox graae + spack architects with Fanning Howey 2009 Exhibition of School Planning and Architecture
2
Woodrow Wilson High School 2009 Site 2011 Site
3
Building a Better Neighbor Community Environment: The restoration of Woodrow Wilson High School will take a beloved community building into the 21 st century. Restoration Historic preservation efforts will focus on adaptive reuse of the 1930s structures, as well as restoring existing brick, woodwork, interior slate, and terrazzo flooring. The Jewel of Ward 3 The original 1930s design was conceived as jewels on a necklace. The new design concept respects this theme by preserving the existing configuration and curved circulation arcade. Community Access The design establishes one primary/student entrance and three community entrances. The primary/student entrance leads visitors in to the large “crossroads” atrium. The community entrances provide after-hours access to the Athletic Center, Main Atrium, Cafeteria/Commons, and Visual + Performing Arts Center. Primary/Student Entrance Access Points
4
A New Take on an Old Tradition Community Environment: Woodrow Wilson High School has a history of serving the community; however, over the decades the change in academic configuration has caused the public-use space to be poorly arranged. The design uses renovations to create the following community facilities: Athletic Center Located next to the newly built natatorium Renovated auditorium serves as new gymnasium New auxiliary gymnasium with showers/lockers for residents Visual + Performing Arts Center Renovated media center and gym serve as Performing Arts space Includes dedicated lobby and arts terrace Acts as community theatre Cafeteria/Commons Available for public meetings and as a surge space for after-school events Athletic Center Visual + Performing Arts Center Cafeteria/Commons
5
Supporting an Academy Approach to Instruction Learning Environment: Despite the limitations of the physical environment, Wilson has developed a highly successful academy program. The design transforms the existing core building into a series of schools-within-a-school, which will align the building program with the current curriculum. Schools-Within-a-School Each academy is designed to create a self-contained learning environment including dedicated space for academy-level administration, classrooms, science labs, resource rooms, teaming space. Special Program Areas The design also provides special program areas such as: 2,810 square feet of JROTC space 6,260 square feet of Career/Technical space 1,060 square feet of Cyber Café
6
Wilson At the Crossroads Learning Environment: A key design element is the reclamation of the basement as a functional space and ground-level entrance. This floor is now home to administrative offices, the media center, and a soaring two-story atrium dubbed “The Crossroads.” A large skylight encloses the existing courtyard, reclaiming space for educational uses while providing the same sense of openness and connection to nature. The media center is located next to the restored Senior Garden, which provides a secure outdoor learning environment complete with beautifully landscaped grounds, sculpture, and outdoor seating. Section – “The Crossroads” Section – Media Center and Senior Garden
7
Greetings and Gardens Physical Environment: As originally designed, Wilson featured a series of gracious outdoor courtyards and a dramatic main entrance oriented around a large green space. The creation of the central atrium allows the building to establish a new main entrance at the north side of the site, away from the athletic fields that have been developed over the years. A series of large skylights respect the function and aesthetics of the original courtyards, creating a series of open, internal gardens where students can gather to collaborate and socialize. The skylights bring natural light into the center of the building. The transparency offered by the design allows students to orient themselves to familiar landmarks, including the school’s prominent tower. “The Crossroads”
8
Going Green Physical Environment: While historic preservation efforts focused on Wilson’s past, design efforts sought to create a sustainable future. When completed, Wilson will achieve LEED Silver certification and will be the first school in the Metropolitan area to incorporate a displacement chilled beam system. Other highlights include: 100% solar domestic hot water Ultra-low flow plumbing fixtures Rain water collection Photovoltaic Panels Replacement of 2 older electric services with 1 new 480 volt service Daylighting in Cafeteria/Commons Photovoltaic Panels
9
A Community Effort Planning Process: The planning and design of Wilson used a collaborative process that relied heavily on community input. During the design phase the community school improvement team will meet every week to discuss continuing design issues. Educational Specifications Educational specifications were developed through the district’s internal planning department. Community input helped lead to the vision of creating schools-within-a-school to support the existing learning academies. Academic Program The development of the academic program, led by the Office of the Chancellor, included the following collaborative approaches: Community meetings Design charrettes Work sessions Visual + Performing Arts Lobby Campus
10
Continued Involvement Planning Process: Design Competition A design competition involving six teams led to the final conceptual solution. Community representatives made up a portion of the design jury and had significant input on each team’s solutions. Ongoing Involvement Community representatives will be involved throughout the project, including during the bi-weekly team meetings held throughout design and construction.
11
Exhibition of School Planning and Architecture 2009 Project Data Submitting Firm :cox graae + spack architects Project RoleArchitect Project ContactChristoffer Graae, AIA, LEED AP TitlePrincipal-in-Charge Address2909 M Street NW City, State or Province, CountryWashington, D.C. Phone202.965.7070 Associate Architect:Fanning/Howey Associates, Inc. Project RoleProgramming/Educational Design Project ContactEdwin R. Schmidt, AIA TitlePrincipal Address210 North Lee Street, Suite 208 City, State or Province, CountryAlexandria, VA Phone(703) 519-9822 Other Firm:Public Pathways, Inc. Project RoleEducational Planner Project ContactDeanna Newman TitleCEO Address1912 Fremont Avenue South City, State or Province, CountryMinneapolis, MN Phone(612) 377-2154 Construction Firm: Project Role Project Contact Title Address City, State or Province, Country Phone
12
Exhibition of School Planning and Architecture 2009 Project Details Project Name Woodrow Wilson High School City Washington State D.C. District Name District of Columbia Public Schools Supt/President Ms. Michelle Rhee, Chancellor Occupancy Date July 2011 (estimated) Grades Housed 9-12 Capacity (Students) 1,550 Site Size (acres) 10.34 Gross Area (sq. ft.) 325,153 Per Occupant (pupil) 209.78 gross/net please indicate gross Design and Build? Yes If yes, Total Cost: $75,000,000 Includes: all hard and soft costs If no, Site Development: Building Construction: Fixed Equipment: Other: Total:
13
2011: Dramatic Main Entrance 2009: Rear of Building
14
2011: Academic Crossroads/Atrium 2009: Unused Core Space
15
2011: Auditorium and Anchor of New Visual + Performing Arts Center 2009: Gymnasium
16
2011: Gymnasiums 2009: Auditorium and Steam Plant
17
2011: Visual + Performing Arts Center with Arts Terrace 2009: 1960s Gymnasium Addition
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.