Download presentation
Presentation is loading. Please wait.
Published byGeoffrey Rose Modified over 9 years ago
1
09/12/2009 SWIM-SUIT User Forum, Rome SWIM-SUIT Project Overview Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator
2
09/12/2009 SWIM-SUIT User Forum, Rome Why SWIM-SUIT? ATM Network Technical Enabler SWIM Technical Enabler SWIM is a key enabler of the future ATM vision
3
09/12/2009 SWIM-SUIT User Forum, Rome Why SWIM-SUIT? How strong are the foundations? ATM Network Technical Enabler SW IM
4
09/12/2009 SWIM-SUIT User Forum, Rome SWIM-SUIT Objectives SWIM Prototype Specification of the requirements for the SWIM implementation Validation of the technologies identified as enablers of the SWIM concept Assessment of the Organisational, Legal and Financial Implications SWIM FEASIBILITY
5
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
6
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
7
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
8
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
9
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
10
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
11
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
12
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
13
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
14
09/12/2009 SWIM-SUIT User Forum, Rome Consortium Composition
15
09/12/2009 SWIM-SUIT User Forum, Rome 15 Consortium at a Glance 10 Countries 20 Partners 6 Industries 1 Airport Managing Company 2 Airlines 2 ANSPs 4 SMEs 2 Research Centres 1 University User Group Budget: 11,8 M€ 6,3 M€ funded by EC Support:
16
09/12/2009 SWIM-SUIT User Forum, Rome 16 The positioning of SWIM-SUIT SESAR Development Phase SESAR Definition phase FOIPS OATA FAA SWIM ICOG OATA MCS CFMU FOS SWIM WP8-14 SWIM-SUIT
17
09/12/2009 SWIM-SUIT User Forum, Rome 17 The Road to SWIM-SUIT Requirements Design Integration Validation WP0 EC European Commission WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing WP4 Validation WP5 Financial and Institutional Financial & Institutional
18
09/12/2009 SWIM-SUIT User Forum, Rome 01/10/200918 The Road to SWIM-SUIT Requirements Design Integration Validation WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing WP4 Validation WP5 Financial and Institutional User Group WP0 EC European Commission Financial & Institutional
19
09/12/2009 SWIM-SUIT User Forum, Rome 19 SWIM-SUIT Prototype ISPOC Prototype ATFCM (CFMU) ACC/APP ACC AOC Flight Simulator FMS EAD USA SWIM Acquire Data MXP AIRPORT Heathrow A-CDM
20
09/12/2009 SWIM-SUIT User Forum, Rome 20 SWIM-SUIT Prototype MXP AIRPORT Heathrow A-CDM ISPOC Prototype ATFCM (CFMU) ACC/APP ACC AOC Flight Simulator FMS EAD Disseminate Data USA SWIM
21
09/12/2009 SWIM-SUIT User Forum, Rome 21 SWIM-SUIT Prototype ATM Virtual Information Pool AVI POOL AOC MXP AIRPORT Heathrow A-CDM ISPOC Prototype ATFCM (CFMU) ACC/APP ACC Flight Simulator FMS EAD USA SWIM
22
09/12/2009 SWIM-SUIT User Forum, Rome 01/10/2009 FABEC CDSTF Meeting 22 SWIM SUIT: Achievements and Next Steps 1234123412341234 2007200820092010 WP1 WP2 WP3 WP4 WP5 D.1.2.1: Information Content & Services Requirements D.1.3.1: Preliminary FHA report D.1.5.1: Overall SWIM Users Requirements D.1.4.1: Information Security Requirements D.1.6.1: SWIM Prototype Requirements D1.6.3 Preliminary Validation Plan
23
09/12/2009 SWIM-SUIT User Forum, Rome 01/10/2009 FABEC CDSTF Meeting 23 SWIM SUIT: Achievements and Next Steps 1234123412341234 2007200820092010 WP1 WP2 WP3 WP4 WP5 D.2.2: Report on candidate technology and service options D.2.3.1: Information Model and Services D.5.2.2: Cost benefit analysis Methodology D.2.4.2: SSDD D.4.2.1: Validation Plan
24
09/12/2009 SWIM-SUIT User Forum, Rome 01/10/2009 FABEC CDSTF Meeting 24 SWIM SUIT: Achievements and Next Steps 1234123412341234 2007200820092010 WP1 WP2 WP3 WP4 WP5 Validation Prototyping Sessions D.1.7.1: Overall SWIM Users Requirements - Final D.5.2.4 - D.5.2.7 CBA D.4.4.1: Validation Report D.5.3.1: Organisational and Legal implications D.4.5.1: Lessons Learned and Recommendations
25
09/12/2009 SWIM-SUIT User Forum, Rome Questions and Feedback http://www.swim-suit.aero/swimsuit/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.