WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance
2
2 How’d we get here Project selection/design guidance SPV highlights Still to come
3
3 2013 pilot projects IH-43 Ozaukee Co. USH 63 St. Croix Co. (x2) STH 179 Crawford Co. STH 29 Brown Co. STH 153 Marathon Co. Spec revisions 1 ¼ – Inch BAD Mill/Pulverize and Relay STH 47 Vilas Co. USH 51 Lincoln Co. STH 73 Wood Co. STH 29 Marathon Co. Fishel Road Forest Co.
4
HMA surfaced mainline AND QMP Subgrade and/or Subgrade improvement AND 30,000 tons+ Between 2010 and 2013 17% of all let projects 31% of HMA projects 54% of HMA projects with 1-1/4” base agg. 4 ProjectSelection – Base Agg. Dense Project Selection – Base Agg. Dense
5
Minimum Mill and Relay or Pulverize and Relay Quantity of 40,000 SY Between 2010 and 2013 3% of all let projects 43% of pulverize and relay projects 56% of mill and relay 5 Project Selection - Mill/Pulv. & Relay
6
QC plan IA requirements Personnel requirements 93% of target density Test frequency “Failing” test/corrective action Measurement and payment 6 Special Provision – Highlights
7
Organizational chart Communication process Source locations list (1 ¼” spec only) Stockpiling and hauling methods (1 ¼” spec only) Process control problem resolution process QC lab, sample, and documentation storage locations Estimate of locations and calculated quantities to be tested under this provision. 7
8
Personnel HTCP Nuclear Density Technician I Or ACT certified technician IA According to the Department’s independent assurance program 8
9
1 ¼ - Inch Base Aggregate Dense ≤20% Recycled Material Modified Proctor Max Dry >20% Recycled Material Mod. Proctor Max Wet Mod. Proctor Max Dry Control Strip Mill/Pulverize and Relay Control Strip 9
10
1 ¼ - Inch Base Aggregate Dense Density – 1 per 1500 tons Gradation – 1 per 3000 tons Proctor – initial and then if trigger met Mill/Pulverize and Relay Density – 1 per 3000 tons Proctor – initial and then if trigger met CA – Optional Information Process control decisions Troubleshooting Limiting liability and/or corrective action limits 10
11
1 ¼ - Inch Base Aggregate Dense Gradation change > 10.0% Source change Recycle material blend change > 10.0% Density > 103% on two consecutive measurements If using control strips; thickness change > 2.0 inches Mill/Pulverize and Relay Layer thickness change > 2.0 inches Density > 105% or <90.0%; AND outside of range of 10 avg control strip shots; on three consecutive measurements 11
12
Density and gradations 30% of Contractor Frequency Target densities; Same triggers as QC Control Strips QV person must be present and verify sufficient compactive effort (including addition of water) Will use same value as contractor 12
13
13 Evaluate QV and QC sampling and testing May include one or more of the following: Split sample testing Proficiency sample testing Witnessing sampling and testing Test equipment calibration checks Additional sampling and testing
14
14
15
1 ¼ - Inch BAD; Tons Mill/Pulverize and Relay; SY Water; MGal 15
16
Facilities Development Manual guidance – March 2014 Project selection guidance Water bid item 10 – 20 gallons per ton 1 ¼ - Inch BAD 3 – 6 gallons per SY Mill/Pulverize and Relay Revisions – Fall 2014 Conversion to STSP – Spring 2015 16 Still To Come
17
Questions Now or On Projects jed.peters@dot.wi.gov or (608)220-0690 17 ftp://ftp.dot.wi.gov/dtsd/bts/pavement/Base_Comp_Docs