Download presentation
Presentation is loading. Please wait.
Published byNathaniel Beasley Modified over 9 years ago
1
1 THE NAVSEA TMDE PROGRAM CDMD-OA EFFORT Donna Morse NSWC IHD Det Earle 04 November 2003
2
2 CDMD-OA CONFIGURATION DATA MANAGERS DATABASE – OPEN ARCHITECTURE (CDMD-OA) Tracks the status and maintenance of naval equipment on ships and naval activities. The term "open architecture" is used to denote the fact that CDMD-OA is a client/server-based system, not dependent upon any vendor's proprietary hardware or software; data may flow to and from CDMD-OA provided that open protocols are used. CDMD-OA was designed specifically to aid in the tracking of configuration data by shore-based Configuration Data Managers (CDMs).
3
3 NAVSEA EFFORT IHD Det Earle role Designated by NAVSEA04L5 as a “Trusted Agent” for TMDE Responsibilities as a Trusted Agent –Prepare work files for submission to CDM –Verify CDMD-OA input data –Initiate and monitor equipment Initial Outfitting –Review records relating to work files
4
4 Trusted Agent responsibility Initial Outfitting Process Essential part of completing and tracking the NAVSEA Test Equipment Modernization Effort by ensuring Initial Outfitting GPETE is entered into CDMD-OA Test equipment gets recorded in CDMD-OA in a timely manner. Records are logistically sound
5
5 Record Review Update existing CDMD-OA test equipment records to ensure that the current SPETERL process will record the correct onboard inventory Review Model, Cage, SCAT Code and APL for existing CDMD-OA records Trusted Agent responsibility
6
6 Task for AIRLANT Initial Outfitting Prepare CDMD-OA Initial Outfitting Records for AIRLANT using the following process –Receive a Naval Message prepared by FTSCLANT (formerly ILO Portsmouth warehouse) to report shipment to end user –Create and submit a CDMD-OA workfile to CDMs –Forward a on-going report to AIRLANT showing what equipment has to shipped to date and corresponding CDMD data entries completed –Verify record entry in CDMD-OA after 45 days –Create work files to delete test equipment records for items turned-in due to the Fleet Modernization Effort
7
7 NAVSEA report Metric INITIAL OUTFITTING METRIC - for work completed for COMNAVAIRLANT -
8
8 NAVSEA report Metric RECORD REVIEW METRIC
9
9 TMDE teaming effort Benefits of using TMDE team as Trusted Agent Activity and TYCOM can track test equipment records in CDMD-OA for initial outfitting procurements originating from NAVSEA Modernization Effort Quality of data in CDMD-OA is consistent –Maintains data integrity Accuracy in SPETERL inventory
10
10 Contact information NSWC IHD Detachment Earle John Lupi - 732-866-2169 lupijj@phst.navy.mil Donna Morse - 732-866-2734 morsedm@phst.navy.mil
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.