JESSICA IN LITHUANIA: An Effort to Renovate Apartment Blocks Inesis Kiškis Lithuanian Ministry of Environment BRUSSELS, March 23, 2011
2
Facts about Lithuanian Housing (I) population - 3,37 million more than 38,000 apartment blocks more than 800,000 apartments 66 % of population lives in multi family buildings built before 1993
3
Facts about Lithuanian Housing (II) most in poor condition, lack of proper management inefficient heating systems and engineering equipment, poor quality windows, roofs, seals between panels more than 57 % of households are not satisfied with their houses During privatization, only apartments were privatized, but not the buildings as such 97% private, only 3 % municipal rental stock
4
Energy supply pattern 65 % of multifamily buildings are served by district heating systems Current energy consumption ~ 160 kWh/m 2
5
Why JESSICA? Attempts to launch modernisation of apartment blocks in early 90s were rejected; World Bank Project in 1996-2004 Subsidised renovation program launched in 2006 Program ran out of money in late 2007 Decision to launch a win-win scheme using JESSICA in early 2009
6
JESSICA Holding Fund Committed: 227 million: - 127 million European Regional Development Fund - 100 million National co-financing Actual Contribution to date: 149,4 million - 127 million European Regional Development Fund - 22,4 million National co-financing
7
Old Renovation Program 50% of investment cost compensated Commercial banks participated in offering own contribution at market rates Borrowers were home-owner associations
8
NewRenovation Program Fixed interest rate at 3% Maturity up to 20 years 2 years grace period (during construction) No collateral 15% written-off if certain energy efficiency level achieved (upon completion) 85-110 kWh/m 2 (Class C) 110-145 (Class D) 100% of costs to prepare renovation documentation reimbursed (paid from national funds) 100% of reimbursement of installments to low income families
9
Some additional figures Number of eligible apartment blocks – 24000 Estimated cost to renovate one apartment block (60 apartments @50 m 2 ) 290,000 Euro After the modernization, one house would halve energy consumption and save 125 MWh a year
10
Eligible costs Costs contributing to increase of energy efficiency: – Replacement of windows – Replacement of doors – Insulation of ceilings/roofs – Insulation of walls – Installation of solar panels/wind mills – Replacement of energy related equipment – Replacement of elevators and electrical wiring in shared areas (stair wells, basements)…
11
Major actors (I) House-owner associations – project proponents
12
Major Actors (II) Housing and Urban Development Agency (HUDA) – advisory services and certification of works
13
Major Actors (III) Commercial banks aka Urban Development Funds (UDFs) – assess creditworthiness, award and administer loans
14
Who Does What: Flowchart
15
Achievements to Date Agreements with 3 UDFs signed 3 loans with home-owner associations signed 71 home-owner associations have decided to join the program 31 investment projects have been vetted by Housing and Urban Development Agency (HUDA) 5 applications under review by UDFs
16
Major Challenge To overcome the distrust, to restore confidence in Government sponsored programs
17
EIB Involvement Selected without any procurement procedure Contract negotiations pretty fast and smooth EIB does a lot of analytical and technical work Authorities hardly would have had enough human resources to accomplish all tasks – Review of the relevant legal acts: EU and national – Identification of the stumbling blocks – Prepare selection criteria for selection of Urban Development Funds (UDFs) – Selection of UDFs – Negotiation and signing agreements with UDFs
18
The Challenges Number of challenges indentified during negotiations with UDFs – Possible state aid issues – need to identify and register – Legality of personal data handling – Turning the apartment owners into borrowers (possibly) against their will, and as a consequence: – Questioning the constitutionality of entire scheme
19
It Shall Work Like This BeforeAfter Thank you!