Download presentation
Presentation is loading. Please wait.
Published byAmber James Modified over 11 years ago
1
INSEA Integrated Sink Enhancement Assessment Sixth Framework Programme Vladimir Stolbovoy, JRC Web: http://www.iiasa.ac.at/Research/FOR/INSEA/http://www.iiasa.ac.at/Research/FOR/INSEA/
2
Objective develop analytical tools to assess economic and environmental effects of enhancing carbon sink and greenhouse gas abatement measures on agricultural and forest lands Sixth Framework Programme
3
Basic Questions about GHG Abatement Measures Where? How? By which technology? At what cost? When? How good? Sixth Framework Programme
4
INSEA-toolbox Land Use/cover Biomass Productivity Ancillary Cost / Technology data Non C-GHGs Biomass crops Sequestered carbon 2030 2000 2050 Global Carbon Cycle Geography of Supply Link to Energy Models Food Crops Agricultural Market Model Sixth Framework Programme
5
INSEA - Models MAIN Home Contact News PROJECT Background Models Brochure Dissemination Project Data Restricted Area LINKS The Wider Network Models developed / used within the INSEA framework Forest Modeling: IIASA Carbon Sink Model (P.C. Benitez, M. Obersteiner) TsuBiMo (mod.) (G. Alexandrov, O. Franklin, D. Rokityanskiy) DIMA (D. Rokityanskiy)DIMA PICUS (M. Lexer, R. Seidl) EU-FASOM/Combined agricultural andEU-FASOM forestry modeling (U. Schneider) Agricultural Modeling: EPIC Environmental Policy Integrated Climate(E. Schmid) AGRIPOL/Engineering Cost Model (B. Dorin) EU-FASOM/Combined agricultural andEU-FASOM forestry modeling (U. Schneider) INRA and AROPAJ/EFEM (DNDC), The Baden-Wuerttemberg case study (D. Blank, S. De Cara, P.A. Jayet) Sixth Framework Programme
6
Problems to solve integrate socioeconomic & biophysical data, spatial & tabular information create an ecosystem-based GIS match different scales maintain thematic and spatial consistency interface with models common meta database Sixth Framework Programme
7
What is studied? Inventory data needs Sort needs: –Common data –Unique data Classify data –Availability –Scale –Variables –Unit Set up priority and time Sixth Framework Programme
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.