Brussels on the 4th of December 2008 - COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008.

Similar presentations


Presentation on theme: "Brussels on the 4th of December 2008 - COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008."— Presentation transcript:

1 Brussels on the 4th of December 2008 - COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008

2 Brussels on the 4th of December 2008 - COBECOS 2 Aims and expectations of the mid-term meeting Decision on which questions to run for the simulation Discuss WP 7 Case study progress – identification of problems and problems to deliver Modification of the computer code

3 Brussels on the 4th of December 2008 - COBECOS 3 Progress during the last 6 months (as agreed in San Sebastian) Contributions for the activity and management report, asap – Finalised in time WP 5 -Finalization of the estimations of theoretical relationships in the case studies To Raul before the 1 st of November. Finalised with small delay WP 6 - Include multi-species functions in the code – 1 st of November – V2 was created to facilitate for multi species WP 7 - Finalization of work package. Distribution of template. Contributions to Charlie before Month 24 – Month 22 template distributed WP 8 - Start of work package –Distribution of template. List of questions to Paolo before the 1 st of September – Finalised in time Workshop for managers and the European Commission – Finalised Final meeting - May 2009

4 Brussels on the 4th of December 2008 - COBECOS 4 Progress month 23 - overall picture WPWP nameResponsible partnerDeliverableDeadline for delivery (excluding 45 days) Month of delivery StatusComments WP 10Project coordinationJRC, IoESWeb-site00Finalized on time WP 1Literature reviewNHHReport3 3Finalized on time WP 2Data CollectionCEDEMReport12 Finalized on time WP 10Project coordinationJRC, IoESInterim activity Report12 Finalized on time WP 4Data harmonizationJRCDatabase128Finalized on timeJRC and Mrag to write a report (no deliverable) WP 3Theoretical modelingIoESReport188, 9Finalized on time - Modifications to the final deliverable Modifications carried out after the Brest meeting. WP10Project coordinationJRC, IoESPeriodic activity report18Finalized on time WP10Project coordinationJRC, IoESPeriodic management report 18Finalized on time WP10Project coordinationJRC, IoESNewsletter18Finalized on time WP 5Estimation of theoretical estimations AZTIReport:(18)24Started WP 6Software developmentCEFASSoft ware package i) design phase ii)implementation phase iii) maintenance phase i - 6 ii - 24 iii - 30 i) 6The design phase finalized on time The implementation phase started First version of V1 and V2 delivered. WP 7Calibrating and testingICReport(21) 24Template prepared WP 8SimulationsIREPAReport 27Questions prepared WP 9ConclusionsJRCFinal report Executive summary 30Starting month 27

5 Brussels on the 4th of December 2008 - COBECOS 5 Various activities Periodic activity reports delivered – evaluation in process Workshop for stakeholders and the European Commission Investigation of the possibility of making the COBECOS computer model available in interface looking application.

6 Brussels on the 4th of December 2008 - COBECOS 6 Focus for the next 6 month All work packages but WP 9 to be finalized (Month 27). Templates for WP 7 to Charlie Next meeting May 2009 (Month 28): report of WP 8 guidelines for WP 9 agreement on lessons learned agreement of recommendations

7 Brussels on the 4th of December 2008 - COBECOS 7 Continue. Aims and expectations of the mid-term meeting - WP 8 - Agreement on questions for simulations 3 categories of questions/simultations: 1. Compliance in the past in the case of different enforcement 2. Future arrangements of fisheries management and enforcement 3. Mix of enforcement tools Each case study needs to answer at least 3 questions


Download ppt "Brussels on the 4th of December 2008 - COBECOS 1 Costs and Benefits of Control Strategies Small- scale consortium meeting Brussels 4th of December 2008."