Download presentation
Presentation is loading. Please wait.
Published byAmanda Harris Modified over 9 years ago
1
Storm tracking and scan scheduling
2
Processing tree (in minutes) 05:00 Nimrod rainfall data produced 10:00 Nimrod data from BADC now at Chilbolton 10:30 Nimrod data cut to size on 400x400km grid 0:00 Met Office Radar network Volume scan 11:00 Tracking done. File with storm props and labels produced. 11:30 New scan procedure submitted to Chilbolton radar
3
Scan Scheduling
4
Prioritize storms that are already being tracked
5
Scan Scheduling Prioritize storms that are already being tracked
6
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
7
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
8
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
9
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
10
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
11
Scan Scheduling Issue when storms cross 0 azimuth line Prioritize storms that are already being tracked
12
64 Pulse pairs per ray Scan at 1deg/second 32 Pulse pairs per ray Scan at 2deg/second Rays are equal width (azimuth) 32 Pulse pairs = less data per ray (more noise?) 2deg/second = faster scanning Scan Options
13
64 Pulse pairs per ray Scan at 0.2deg/second 32 Pulse pairs per ray Scan at 0.2deg/second Scan Options
14
Further work Automate process – John Nicol’s code waits for new Nimrod file to arrive at Chilbolton, then cuts it to size – Add “wait” command to tracking code that looks at list of filenames and waits for new Nimrod files to process – Link tracking and scan scheduler Test code at Chilbolton Test remote scanning display
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.