Presentation is loading. Please wait.

Presentation is loading. Please wait.

Advanced Scheduling In MS Project Provided by FrontRange MPUG.

Similar presentations


Presentation on theme: "Advanced Scheduling In MS Project Provided by FrontRange MPUG."— Presentation transcript:

1 Advanced Scheduling In MS Project Provided by FrontRange MPUG

2 Advanced Scheduling Features MS Project Scheduling Engine –Duration Equation D=W÷(UxPHPD) –Task Type –Effort Driven Advanced Options Calendars –Project –Task –Resource

3 Analyzing/Revising the Schedule Task Relationships Critical Path Resource Allocation –Allocation Analysis –Assignment Contours –Interactive Scheduling/Leveling Revising the Schedule –Schedule Overtime –Add Resources –Reduce Scope

4 Closing Use the logic of the tool to command the schedule Dependencies due to nature of the task and/or company policy only Limit use of constraints Don’t hide schedule manipulation, leave road signs Resource availability is a huge risk to your schedule, resource management is vital

5 For More Information…


Download ppt "Advanced Scheduling In MS Project Provided by FrontRange MPUG."

Similar presentations


Ads by Google