Download presentation
Presentation is loading. Please wait.
Published byGabriel O'Connell Modified over 11 years ago
1
Fitness Checks - State of Play 22 March 2012 HLG of independent Stakeholders on Administrative burden reduction
2
FITNESS CHECKS FIT FOR PURPOSE? comprehensive evaluation of the regulatory framework identify excessive regulatory burdens, overlaps, gaps, inconsistencies and/or obsolete measures; identify the cumulative impact of legislation.
3
FITNESS CHECKS – PILOT PROJECTS ENV: EU Freshwater Policy EMPL: Information and Consultation of Workers MOVE: Internal aviation market SANCO:Food chain ENTR: Type-approval of motor vehicles
4
ENV: EU Freshwater Policy Scope the Water Framework Directive, the Groundwater Directive, the Directive on Environmental Quality Standards, the Urban Waste Water Directive, the Nitrates Directive, the Floods Directive.
5
ENV: EU Freshwater Policy Timetable 2011preliminary study (Deloitte and IEEP): - literature review - stakeholder consultation - workshop 2012public consultation stakeholders workshop (members of the Strategic Coordination Group of Common Implementation Strategy of the Water Framework Directive) 2012 Final report
6
EMPL: Information & Consultation of Workers Scope Directive 98/59/EC on collective redundancies Directive 2001/23/EC on transfers of undertakings Directive 2002/14/EC establishing a general framework relating to information and consultation of workers in the EC Timetable 2012 finalisation of a study (Deloitte) presentation of study to Expert Group on ICW
7
MOVE: Internal aviation market Scope legislation on common rules for the operation of air services in the EU regulations on computerized reservation systems and insurance requirements for air carriers and aircraft operators Timetable Ongoing studies: - Price Transparency study - Computerised Reservation Systems study - Insurance requirements for air carriers study 2012/2013 Final report
8
ENTR: Type-approval of motor vehicles Scope a framework directive 7 implementation directives and regulations Timetable Feb. 2012: information of stakeholders Spring 2012:roadmap 1 st steering group meeting launch of study 2012/2013 delivery of study report 2013: final report
9
SANCO: Food chain Scope:Food chain sector Process/timetable: being developed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.