Lean Production (MUDA)
Ijaz Ul Hasan NPO Pakistan
2
Why we produce ? ? ?
3
What is Lean Lean = waste-less
Waste = non value-added = MUDA in Japanese Productivity = Maximize “Productivity” Minimize “Input”, if “output” is fixed Constant “Input”, more “output” Output Input
4
Wastages (MUDA) Input ? ? ? ? What Else ???????????? Machines
Man (Human Resources) Material Method Money What Else ???????????? Wastages (MUDA)
5
Wastages (MUDA) Any activity or process that adds costs but adds no value (for the customer). There are a lot of “MUDA” in our business. Do not miss (even) small “MUDA” To realize “Lean” “Kaizen” is mandatory Kaizen by Genba + Management support
6
Non Value Added (Wastages)
Transportation Inventory /WIP Motion Waiting Over Production Over Processing Defect Not used creativity of employees
7
Transportation Unnecessary movement of information, products or components from one area to another. Unnecessary transport usually occur together with unnecessary movement, product damages, lost parts and systems, which detect movements.
8
Before: 546 feet After: 222 feet
Transportation of main part of one of the Agri Implement 100 ft 10 ft 5 ft 10 ft 65 ft 10 ft 136 ft Before: 546 feet 25 ft 55 ft 50 ft After: 222 feet 80 ft W E
9
Difficult to transport in our local industry
10
Follow the bouncing paperwork
11
Inventory/WIP Inventory is the quantity of items on stock, which are required to manufacture a product. These goods also cause costs to the company. When they are not used they utilize valuable warehouse space, may become obsolete and may require raw materials, which cannot be used for more important goods.
12
Competitive organizations make sure that their system controls the inventory, so that money is not being wasted on unwanted items or build groups.
13
Lowering Inventory Reduces Waste
Scrap Work in process inventory level (hides problems) Unreliable Vendors Capacity Imbalances The analogy presented in this and the next four slides may help to illustrate the action of inventory in hiding problems.
14
Lowering Inventory Reduces Waste
Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP
15
Lowering Inventory Reduces Waste
Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP
17
Motion Unnecessary movements occur when employee is moving around his work space and as a result of this may waste time and effort. All kind of unnecessary motion is being caused by poor working standard practices, poor (not optimal) process design or work area layout.
19
The crouching posture is MUDA of motion
I can take it easily The crouching posture is MUDA of motion Parts rack Up Before improvement After improvement
21
Waiting Each step in a manufacturing process is dependent on the upstream and downstream stage processes. If employees, equipment, information or materials of the production process are delayed, production time is wasted and the cost of production will be increased.
22
Turner operating two machines now
Waiting eliminated Turner operating two machines now
23
Over Production Overproduction arises when the company is producing more than the customer really requires. This may include both the production of products or components for which there are no orders, as well as production of more items than currently needed.
24
Over Production This is the worst kind of waste, because it usually multiplies other kinds of waste. It increases rework rate, inventory, processing, waiting, as well as unnecessary motion and transportation
26
Over Processing Over processing includes extra steps in the manufacturing process which need to be taken. It can also mean producing products of a higher quality than required. This may be due to incorrectly used equipment, errors in rework process, poor process design or bad communication. This can be also result of not checking what are the real customers’ requirements.
27
Example
28
Non Conformance (Defects)
Rework is required when products and components are defective or damaged and they have to be reworked. Defects are caused by bad manufacturing processes (caused by human or machine errors). Rework takes additional time and therefore increases manufacturing costs of the final product. In worst case scenario the items have to be discarded.
29
Un Controlled Process Defects occur due to
Owner/manager has no training in this process! Mishandling Lack of Knowledge Inputs
30
Not Used: Creativity Of Employees
This waste involves loss of time, skills, ideas, improvements and learning opportunities by not taking employees opinion into the account. This is result of employees not taking part in design of manufacturing processes. Only in this way the ideas can develop, which are needed to eliminate and avoid the other seven sources of waste. This helps to improve your processes in continuous manner by increasing the available knowledge and creativity of you employees. In addition it helps in principle to increase the level of employees’ satisfaction at work.
31
People who work in the process and know the process best (both the strengths and weaknesses).
Do they have the tools, training and permission to systematically improve their process?
32
Thanks