Download presentation
Presentation is loading. Please wait.
Published byKimberly Bradford Modified over 11 years ago
1
Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
2
2 Content. Introduction. Process description. State of play. Details on public consultation. Next steps
3
3 Introduction (1). During the interim period, ERGEG assumed the role assigned to ACER by the 3rd package and worked on pilot Framework Guidelines (FG). ERGEG has been working on three FG: » Electricity Grid Connection » Capacity Allocation and Congestion Management » System Operation
4
4 Introduction (2). Work on drafting the FG on System Operation was concluded under ACER. ACER was invited to submit to the Commission, by 31 December 2011, a framework guideline on electricity system operation
5
5 Process description (1). General timeline as set out in Reg. (EC) 714/2009
6
6 Process description (2). Annual priority list Commission. Consultation with ACER, ENTSO-E, other relevant stakeholders. Areas for the development of FG/NC. Initial Impact assessment ACER. To support the development of the FG. Expert group representing wide industry perspective. Identification of problems / objectives / policy options
7
7 Process description (3). Framework Guidelines (FG) ACER. Invitation from the Commission to draft FG. Public consultation. Adoption of the FG / Submission to the Commission (6 months). Network Codes (NC) ENTSO-E. Commission request. ENTSO-E prepare the NC in line with the FG (12 months). ACER reasoned opinion on NC (3 months)
8
8 State of play. ACER deliverables on FG ( 2011 Work Programme ). Electricity Grid Connection (finished). Capacity Allocation and Congestion Management (finished). System Operation (on-going). Balancing (to be delivered in mid 2012)
9
9 Details on public consultation (1). Public consultation on Draft Framework Guidelines on System Operation » Run from 15 July to 15 September 2011. Email-based consultation » Submission of comments to: consultation2011E05@acer.europa.eu consultation2011E05@acer.europa.eu » Personal details should be enclosed. Constructive and comprehensive responses » Large companies invited to coordinate their answers internally
10
10 Details on public consultation (2). Questionnaire to steer the structure of responses » 8 general issues, 4 specific issues. Transparency » Responses will be published on the ACER website » Comments marked confidential will be considered but not disclosed
11
11 Next steps. Public consultation » On-going » Ending on 15 September 2011. Evaluation of responses » Within approximately two months. Finalization of the FG » Submission to EC by 31 December 2011
12
12 Thank you for your attention www.acer.europa.eu
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.