CARPE DIEM 5 th meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental Management
2
CARPE DIEM 5 th meeting Status of the project Review of TSC report Review of Sempere Torres report Final workshop Discussion about a possible 6 th FP follow- on action Second Year Report e-TIP
3
CARPE DIEM 5 th meeting
4
WPTopicList of project deliverables from the beginning up to now Partners involved WP 1 PROJECT MANAGEMENTAdministrative matters Financial situation Preparation of 2 nd year report Final workshop Discussion about a follow-up proposal Set-up of Technical Steering Committee Report of the kick-off Meeting 1st TSC report 2nd TSC report Project coordinator All CARPE DIEM Partners WP 2 DOPPLER WINDSReport containing 2-dimensional Doppler wind field retrievals for a number of events. Improved techniques for clear air retrievals of wind and boundary layer information Super-observation dataset Maps of the partner 1 region detailing those areas accessible to dual- Doppler analyses, and any accessible to three Doppler radars. Multiple Doppler dataset Analysis of Multiple Doppler wind field Extraction of clear-air wind 4, 6, 1,3
5
CARPE DIEM 5 th meeting WPTopicList of project deliverables from the beginning up to now Partners involved WP 3 – DATA ASSIMILATION Implementation of the observation operators for radar radial winds in 4D-Var Implementation of continuous assimilation based on nudging Status of activities on the inter-comparison experiment Software modules for 4- dimensional assimilation 4, 5, 7 WP 4 – ASSESSMENT OF NWP MODEL UNCERTAINTY INCLUDING MODELS ERRORS Software modules for ML/SKF approach Status of the activities Software modules for ML/SKF approach 2, 4, 7 WP 5 – ASSESSMENT OF IMPROVEMENTS IN NWP MAP cases - Analysis of severe weather situations Implementation of the VSRF system Analysis of severe weather situations Set-up of VSRF procedure 1, 8 WP 6 – ANOMALOUS PROPAGATION Advancing in ANAPROP modelling. Assimilation of radar products in real-time while processing simulation. Display tool to compare prediction and observation. PC-based application producing predicted images of terrain or sea clutter caused by anaprop effects based on mesoscale NWP model products 6, 7
6
CARPE DIEM 5 th meeting WPTopicList of project deliverables from the beginning up to now Partners involved WP 7 – ADVANCED SURFACE RADAR-BASED RAINFALL ESTIMATE APPLYING NWP MODEL DATA VPR Correction in a radar Network Status of activities Verification on the improvement in radar derived surface precipitation using OP correction. Implementation of the program, which enables direct comparison of observed VRPs and simultaneous 1D columns of the NWP model variables at the same point 5 WP 8 – USE OF POLARIMETRIC RADAR DATA FOR IMPROVE THE RADAR RAIN ESTIMATE Use DP to establish uncertainty in rainfall estimates due to variations in Z- R for different spatial and temporal scales of model input Status of activities Critical review of present state of the art multi-polarisation rainfall estimation techniques Climatology of variations in Z-R at different spatial and temporal scales of model input obtained by DP method 6, 4 WP 9 – ASSESSMENT OF THE BIAS, SPATIAL PATTERN AND TEMPORAL VARIABILITY OF ERRORS IN THE DIFFERENT SOURCES OF AREAL PRECIPITATION ESTIMATES Status of activities Comparison of precipitation estimates with mesoscale analysis, stochastic model and Kriging Delivery of a report on precipitation estimate assessment Comparison of precipitation estimates with mesoscale analysis and stochastic model. Comparison of flood estimates and forecasts using the semi-distributed model in the Swedish catchment Comparison of flood estimates and forecasts using the simpler lumped models in the Irish catchment Comparison of flood estimates and forecasts using the more complex distributed model in the Irish catchment 4, 2, 8, 9
7
CARPE DIEM 5 th meeting WPTopicList of project deliverables from the beginning up to now Partners involved WP 10 – OPTIMAL USE OF RADAR, NWP AND RAINGAUGE DATA IN PRECIPITATION FORECASTS FOR IMPROVING FLOOD FORECASTS IN URBAN AND RURAL CATCHMENTS Status of activitiesMethodology for optimal use of radar, NWP and raingauge data 9, 1, 2, 4 WP 11 – END-USERS’ LEVEL-OF SERVICE REQUIREMENTS End users requirements Updating of End-Users assessment Basic End-Users requirements End-Users Assessment document 9, 1, 4, 5, 7 WP 12 – PROJECT RESULTS DISSEMINATION WEB Dissemination status Web site Workshops All CARPE DIEM Partners
8
CARPE DIEM 5 th meeting Review of external expert reports Technical Steering commettee Daniel Sempere Torres
9
CARPE DIEM 5 th meeting Possible follow-on project Result from the ACTIF meeting RainClouds Depending on the call, there is the possibility to present a STREP (new name for RTD project like CARPE DIEM)
10
CARPE DIEM 5 th meeting Final workshop At the Colchester meeting was agreed to try to put the final workshop within the ERAD 2004 conference (Sept. 6-10 2004) As a second possibility we can insert the final workshop with the EGS Plinius – topical conference on Mediterranean storms. This conference aims to collect in the same place different communities (meteorologists, hydrologists, geologists) to discuss about risk management. Possible dates mid-oct 2004 (17-24). It could be possible that this conference will be organized on a ship within a one week trip (over the Mediterranean Sea). There is a possibility to organize together with the final workshop a “radar school” where the different CARPE DIEM area could present their results (this is also encouraged by the TSC) As a third possibility the final workshop could by organized in Bologna (again there is the possibility to co-organized a radar school), possible period November. No other idea.
11
CARPE DIEM 5 th meeting To be send to the Commission within two months of the end of the 2 nd year. Proposed time schedule each area coordinator should send a short report (1-2 pages), to be inserted in the executive summary, before the end of January. each partner should send the text section and the “cost statement” to the coordinator before the end of January. I will collect all contributions and send a draft of the report by the 10th feb. Time for comments/modifications up to 20th Feb. Send report to the Commission 2 nd Annual Report
12
CARPE DIEM 5 th meeting The Periodic Report provides information on the progress made in the project. SECTION 1, corresponding to the Management Report. SECTION 2 contains an executive summary describing the main results achieved in the project during the reporting project. SECTION 3 is dedicated to the progress made, organised per work package. The individual contributions of each partner should be described. This will give an opportunity to closely follow the progress made in each work package and to inform all the partners of the overall progress of the project. One important aim of FP5 is to put more attention to the exploitation of the results. Therefore, the requirement to prepare annually a draft T.I.P (SECTION 4) will help the project consortium to be oriented to the dissemination and exploitation of the results since the beginning of the project.
13
CARPE DIEM 5 th meeting
16
SECTION 4 eTIP
17
CARPE DIEM 5 th meeting SECTION TWO What is the TIP?
18
CARPE DIEM 5 th meeting What is the TIP? For the Commission:- A compulsory deliverable Specified in the model contract The means by which the contractor documents the exploitation efforts that they are obliged to undertake Agreed by all Programmes after wide consultation
19
CARPE DIEM 5 th meeting What is the TIP? For the researcher:- A tool to help plan and implement exploitation A way to demonstrate the benefits of the research A means to gain publication of results A means to keep commercial plans confidential
20
CARPE DIEM 5 th meeting What is the TIP? Format:- Common to all Programmes Collects all exploitation information in one submission Electronic
21
CARPE DIEM 5 th meeting § 17.1 of Model Contract The technological implementation plan shall include a summary of the project and a forecast of the intentions of the contractors, as well as a description of their achievements regarding the use of the knowledge. What is the TIP?
22
CARPE DIEM 5 th meeting The eTIP is found at www.cordis.lu/etip How to submit a TIP?
23
CARPE DIEM 5 th meeting How to submit a TIP?
24
CARPE DIEM 5 th meeting How to submit a TIP?
25
CARPE DIEM 5 th meeting How to submit a TIP? STEP 1 The Project Coordinator registers themselves, all the project partners, and the project details. STEP 2 The partners or the coordinator provide details of their individual exploitable results from the project. STEP 3 The coordinator checks that everything has been completed and submits the eTIP.
26
CARPE DIEM 5 th meeting Step one: Coordinator registers
27
CARPE DIEM 5 th meeting
28
How to submit a TIP? INFORMATION Summary of project Description of results including categorisation into types A,B, or C Ownership of results COMPLETED BY Co-ordinator USE Update project data Promote results
29
CARPE DIEM 5 th meeting How to submit a TIP? INFORMATION Partner intentions IPR Protection measures Community added- value Differences to plan COMPLETED BY Coordinator OR Partners individually USE Internal by Commission services (not published) Aggregation at Commission level of partner information for reporting
30
CARPE DIEM 5 th meeting How to submit a TIP? INFORMATION Externally exploitable results Collaboration requests Offers of technology COMPLETED BY Partners (results owners) Mandatory if result is Type A USE CORDIS for publication IRC for promotion LIFT for financing IPR for protection
31
CARPE DIEM 5 th meeting How to submit a TIP? INFORMATION Assessment of EU impact COMPLETED BY Co-ordinator COMMENTED ON BY Commission Project Officer USE Justifies project Is commented on (confidentially) by Commission Project Officer
32
CARPE DIEM 5 th meeting How to submit a TIP? eTIP Functions: Can be completed and saved in sessions Pre-populated with project data Co-ordinator, partners and CPO have own access Confidentiality of data assured Data goes straight into a database Performs all functions of former TIP form
33
CARPE DIEM 5 th meeting Project id : carpediem project password:carpediem
34
CARPE DIEM 5 th meeting Partner id password progea dlr_cd smhi_cd fmi uessex ubarcelona isac nuid progea dlr_cd smhi_cd fmi uessex ubarcelona isac nuid