Download presentation
Presentation is loading. Please wait.
Published byNoah Jenkins Modified over 9 years ago
2
28/9/2010Stefano Caiazza - Midterm Review2
3
Scientific Background 28/9/2010 Stefano Caiazza - Midterm Review 3
4
The FLC group and my project framework Stefano Caiazza - Midterm Review28/9/20104
5
How does a TPC work Physic processes in a TPC Stefano Caiazza - Midterm Review28/9/20105
6
Gas amplification structures Stefano Caiazza - Midterm Review28/9/20106
7
Step 1: Design Stefano Caiazza - Midterm Review28/9/20107
8
The GEM and the ceramic mounting Stefano Caiazza - Midterm Review28/9/20108
9
Anode pad readout plane Stefano Caiazza - Midterm Review28/9/20109
10
Future plans & milestones Full module assembly Quality control LP measurements Stefano Caiazza - Midterm Review28/9/201010 Data for a publication by mid 2011
11
Overview: Training Stefano Caiazza - Midterm Review28/9/201011
12
Overview: Results Stefano Caiazza - Midterm Review28/9/201012
13
Acknowledgements Stefano Caiazza - Midterm Review28/9/201013 This work is a collaborative effort of many people in and outside my group
14
Backup Slides Stefano Caiazza - Midterm Review28/9/201014
15
How does a TPC work Physic processes in a TPC Stefano Caiazza - Midterm Review28/9/201015
16
Gas amplification structures Stefano Caiazza - Midterm Review28/9/201016
17
Commissioning test box Stefano Caiazza - Midterm Review28/9/201017
18
Future plans Stefano Caiazza - Midterm Review28/9/201018
19
Future plans Data Analysis LP Measurements Optimization GEM gating R&D Stefano Caiazza - Midterm Review28/9/201019
20
The GEM and the ceramic mounting Stefano Caiazza - Midterm Review28/9/201020
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.