4 Biosolids Amendment += § Press Solids 15% to 20% Dry § Dried Biosolids 75 % to 80% Dry § Mixture is Now 40% to 45% Dry § Low Odor & Ready to Compost

5 Winter Operations

6 Composting

7 Public Education §You Must Believe In Product You Will Be Tested §Imagine Taking A Gallon Of Effluent §Biosolids Present The Same Challenges Plus a Few Surprises

8 PUBLIC INPUT §1991 to 2000 §7 ODOR Complaints §2001 §50 ODOR Complaints § §2002 § §9 ODOR Complaints § §5 During North Wind Condition

9 Residential Users § §19983 § §19993 § §200030 § §200175 § §200277 (35 new 7 months) § §Options § §No Change § §Use Contractor Haul off Site § §Cover Process Building § §Other

10 Cost Analysis Per Dry Ton

11 Weather Data Think Ahead § §Temperature § §Humidity § §Wind Direction § §Wind Speed § §Precipitation

12 MOLLY CREEKSIDE CHATEAU NEW SOURCE X WWTPN

13

14

15 Biofilter   Top Soil$110.00 § §BiosolidsNo Charge § §Course Sand$90.00 § §Lime$325.00 § §Peat Moss$547.00 § §Wood Chips$300.00

16

17

18 Fence$180.00

19 § §Blowers$415.00 each § §Electrical Equipment$1520.00 § §Piping Material$270.00 § § 1 1/2” Rock$62.00

20

21

22

23 § §Project Cost$3,396.00

24

25 Air Flow FromFrom AtmosphereAtmosphere TOTO BiofilterBiofilter

26

27 46 o F46 o F 128 o F128 o F

28

29 Temps Pre Aeration & Post Aeration §160 o F §142 o F §124 o F §112 o F §152 o F §156 o F § §152 o F § §136 o F § §134 o F § §154 o F § §168 o F 20 minutes of Aeration Forward & Reverse (3hrs./Day Winter Avg.)

30

31

32 ODORODOR Odor Gone Low Wind

33 Odor Gone High Wind ODORODOR

34 Odor Gone Phase 2

35 § §Black Drain Pipe § §Misc. Fittings § §Bark for air Distribution § §Tarp Covers § §Sand Bags § §Annual Expense$790.00 Annual Operational Expenses

36 Screening of Product <.25” <.75” >.75” IN

37 Finished Product

38 At the very least a lot more plentiful ! ???Questions???


Download ppt "Corrective Action or Move to a New Back Yard Co-authors: Ken MasonCity of Louisville Dan PetersSan Juan Engineering Paul BonniciMontgomery Watson Harza."

Similar presentations


Ads by Google