Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:

Similar presentations


Presentation on theme: "1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:"— Presentation transcript:

1 1 Software development WP6

2 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI: links FLR to databases JRC: testing solutions for less experienced users (web access version)

3 3 WP 6 software Description of work

4 4

5 5 Planning Discussed at meeting (14 June – London) WP 6 Software WP 3 Theoretical Modelling WP 2/4/5 Data collection Harmonisation Estimation WP 7 (IC) Model WP 8 Simulations

6 6 Feedback WP 6 Software WP 7 (IC) Model WP 8 Simulations r – the software used Also in r Or a module of FLR? MSE

7 7

8 8

9 9 Requirement for development of generic code Implement COBECOS theoretical approach on a case-study basis Each case-study has individual requirements Guidance can be provided Use bio-economic model versus Management Strategy Evaluation (MSE)– depends on resources, data, linkages to other projects. COBECOS requirements

10 10 Operating Model Computer simulation of complex "Reality" Assessment Computer simulation of sampling and assessment process Management Controls Computer simulation of management based on perception of the system Process errors are generated in the operating model. Data for assessments are generated with measurement error Estimation errors arise due to the assessment procedures. Assessment results in a Perceived system. Performance Statistics Feedback Performance Statistics Management Strategy Evaluation

11 11

12 12

13 13 Pros/cons Multi-fleet (<3 stocks) Parameterisation Integrating COBECOS code Provides shadow value of biomass

14 14 Case studies which can/will undertake MSE currently as part of another project – EFIMAS Northern hake, CCAMLR, Ligurian, (Dutch), Channel (if stock)

15 15 Code for computation of ? –Derive Other functions? (regressions etc) Within case study: resources required! (dedication of participants – at case study level) Work-plan


Download ppt "1 Software development WP6. 2 Team CEFAS: architecture and documentation IC: modules for calculating new functions (penalty prob.; enforcement cost) AZTI:"

Similar presentations


Ads by Google