HISTORY OF PRESENT EXPANSION 2008 DR. KUDESIA THEN MS KH ENVISIONED CONVERSION OF KASTURBA HOSPITAL INTO A MULTISPECIALITY HOSPITAL. SHE GOT SUPPORT FROM THE DIRECTIONS OF P.M. OFFICE PROMOTING WELFARE SCHEMES FOR MINORITY COMMUNITY AREAS. WE WERE FORTUNATE TO GET THE REQUISTE FUNDS AND PRIORITY APPROVAL TO ADD SEVERAL NEW SPECIALITIES & EXPAND THE HOSPITAL SERVICES.
5
HISTORY OF PRESENT EXPANSION 2009 NEW OPD BLOCK WAS ADDED 2010 WE STARTED DEPARTMENTS(OPD) IN SURGERY, EYE, ENT & SKIN. SPECIALISTS WERE TAKEN ON LOAN FROM OTHER MCD HOSPITALS AND SENIOR RESIDENTS WERE SUBSEQUENTLY ADDED.
6
HISTORY OF PRESENT EXPANSION 2013 DURING INSPECTION OF THE HOSPITAL, HON. ADDL COMM(NORTH) Mr. MAYANK SHARMA ENVISAGED A NEW 300 BEDDED MULTISPECIALITY BLOCK AT THE SITE OF THE OLD OPD BLOCK WHICH IS OVER 100 YRS OLD AND HAD BEEN ABANDONED DUE TO SAFETY REASONS.
7
OLD OPD BLOCK 100 YRS OLD
8
SITE OF OLD OPD BLOCK
9
NEED FOR 11 STORIED BUILDING OUR NEED WAS FOR PROVIDING IN-PATIENTS AND O.T. FACILITY TO THE NEW DEPTS. IN EYE, ENT, SURGERY & SKIN. NEED FOR SEPARATE AND LARGER CASUALTY CUM DISASTER WARD. ISOLATION WARD FOR EPIDEMICS NEED FOR MORE BEDS FOR – PAEDIATRIC WARD. – MED WARD AND CCU.
10
NEED FOR 11 STORIED BUILDING MORE SPACE REQUIRED FOR DEPTS. OF RADIOLOGY ANG IMAGING.(INCREASING NO. OF MACHINES) MORE SPACE FOR PATHOLOGY DEPT. FOR THEIR EXPANSION(NEWER AUTOMATIC PROCESSING MACHINES). O&G REQUIRE PLACE FOR INFERTILITY & ONCOLOGY UNIT ULTIMATELY TO PROVIDE BETTER FACILITY AND CARE TO OUR PATIENTS
11
11 STORIED BLOCK Based upon demand from various departments following areas and beds have been allocated in the architectural maps: Casualty - 20 beds Paediatric ward - 60 beds Medical wd. & CCU- 60 beds Surgery - 60 beds Ortho beds - 40 beds
12
11 STORIED BLOCK Ophthalmology - 10 beds ENT Ward - 10 beds Department of Radiology Department of Pathology Department of O&G
13
FINACIAL IMPLICATIONS TOTAL ESTIMATED COST135 CRORE 2013-140.10 CRORE 2014-1515 CRORE 2015-1650 CRORE 2016-1770 CRORE EXPECTED DATE OF COMMENCEMENT OF CONSTRUCTION 2014-15 EXPECTED DATE OF COMPLETION 31.03. 2017
14
EXISTING SITE PLAN
15
ARCHITECTURAL DETAILS SITE AREA17431 SQ. MT. MAX PERMISSABLE GROUND COVERAGE – @ 30% 5229 SQ.MT. MAX FAR @ 200%34862 SQ.MT. BROADLY 2200 SQ.MT. PER FLOOR 11 STORIES 3 BASEMENTS