Presentation is loading. Please wait.

Presentation is loading. Please wait.

Brest, 27 – 29 of February 2008- COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th.

Similar presentations


Presentation on theme: "Brest, 27 – 29 of February 2008- COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th."— Presentation transcript:

1 Brest, 27 – 29 of February 2008- COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th – 29 th of February NOTES 1. PLACE, DATE AND EVENT NAME 1.1. Access the slide-set place, date and event name text box beneath the JRC logo from the Slide Master. 1.2. Do not change the size nor the position of that text box. 1.3. Replace the mock-up texts for the place (Place), the date (dd Month YYYY) and the event name (Event Name) with your own texts. 1.4. Set it in MetaPlus Book Roman, if you own the typeface. Otherwise, keep the original typeface – Arial. 1.5. Keep the original flush-left justification. 1.6. Keep the original font colour (white). 1.7. Keep the original font body size (7 pt) and the text on one single line. 2. SLIDE NUMBER 2.1. The slide number on the banners lower right-hand side is automatically generated. 3. SLIDES 3.1. Duplicate the first slide as needed. 3.2. Do not change the size nor the position of the slides text box. 3.3. Try not to place more text on each slide than will fit in the given text box. 3.4. Replace the mock-up heading text (Joint Research Centre (JRC)) with your own text heading. 3.5. Set it in Eurostile Bold Extended Two or in Helvetica Rounded Bold Condensed, if you own one of these typefaces. Otherwise, keep the original typeface – Arial. 3.6. Keep the original flush-left justification. 3.7. Keep the original font colour (100c 80m 0y 0k). 3.8. Keep the original font body size (28 pt) and the heading on one single line whenever possible. Reduce the font body size if needed. 3.9. Replace the mock-up text (The European Commissions Research-Based Policy Support Organisation)) with your own text. 3.10. Set it in MetaPlus Book Roman, if you own the typeface. Otherwise, keep the original typeface – Arial. 3.11. Keep the original flush-left justification. 3.12. Keep the original font colour (100c 80m 0y 0k). Use black if you need a second colour. 3.13. Keep the original font body size (22 pt) or reduce it if unavoidable. 3.14. Replace the EU-27 map mock-up illustration with your own illustration(s). 3.13. Try to keep your illustration(s) right- and top- or bottom-aligned with the main text box whenever possible. NOTES 1. PLACE, DATE AND EVENT NAME 1.1. Access the slide-set place, date and event name text box beneath the JRC logo from the Slide Master. 1.2. Do not change the size nor the position of that text box. 1.3. Replace the mock-up texts for the place (Place), the date (dd Month YYYY) and the event name (Event Name) with your own texts. 1.4. Set it in MetaPlus Book Roman, if you own the typeface. Otherwise, keep the original typeface – Arial. 1.5. Keep the original flush-left justification. 1.6. Keep the original font colour (white). 1.7. Keep the original font body size (7 pt) and the text on one single line. 2. SLIDE NUMBER 2.1. The slide number on the banners lower right-hand side is automatically generated. 3. SLIDES 3.1. Duplicate the first slide as needed. 3.2. Do not change the size nor the position of the slides text box. 3.3. Try not to place more text on each slide than will fit in the given text box. 3.4. Replace the mock-up heading text (Joint Research Centre (JRC)) with your own text heading. 3.5. Set it in Eurostile Bold Extended Two or in Helvetica Rounded Bold Condensed, if you own one of these typefaces. Otherwise, keep the original typeface – Arial. 3.6. Keep the original flush-left justification. 3.7. Keep the original font colour (100c 80m 0y 0k). 3.8. Keep the original font body size (28 pt) and the heading on one single line whenever possible. Reduce the font body size if needed. 3.9. Replace the mock-up text (The European Commissions Research-Based Policy Support Organisation)) with your own text. 3.10. Set it in MetaPlus Book Roman, if you own the typeface. Otherwise, keep the original typeface – Arial. 3.11. Keep the original flush-left justification. 3.12. Keep the original font colour (100c 80m 0y 0k). Use black if you need a second colour. 3.13. Keep the original font body size (22 pt) or reduce it if unavoidable. 3.14. Replace the EU-27 map mock-up illustration with your own illustration(s). 3.13. Try to keep your illustration(s) right- and top- or bottom-aligned with the main text box whenever possible.

2 Brest, 27 – 29 of February 2008- COBECOS 2 COBECOS progress month 13 - overall picture #Deliverable Delivery month Status D1Literature review3Finalized – 15/5 -07 D2Description of fisheries in project, their management, enforcement and enforcement costs 12Data collection template available - 24/9 -07 Data available for 6 fisheries – 27/2-08 Report: text downloadable from the database D4On-line database of project data16Finalized – 24/9 -07 D3Fisheries enforcement: Basic theory and how to apply it 18Second draft available – 21/10 - 07 D7A report outlining for each fishery the compliance, the private benefit and the enforcement cost in the past 21 D5Theoretical enforcement relationships24Started D6Software package to evaluate costs and benefit of enforcement 30Basic system design completed. Implementation phase started ? D8An extensive report describing (i) the empirical enforcement model, (ii) the simulation outcomes and (iii) answers to particular questions for each fishery. 27 D9Final report; conclusions and recommendations 30

3 Brest, 27 – 29 of February 2008- COBECOS 3 Focus for the next 6 months (from London) Finalizing of the data collection for the case studies – 3 case studies missing Agreeing on a standard description for data harmonization covering all fisheries – Available 24/9 Starting to develop the on-line database containing data collected under WP-2 – Operational 18/12 Finalizing the theoretical model – Second draft 21/10 Implementing the FLR software - ?

4 Brest, 27 – 29 of February 2008- COBECOS 4 Various activities Access to the yearly enforcement reports that is sent to the Commission on a yearly basis. New COBECOS web page – information exchange tool Meeting with the project officers

5 Brest, 27 – 29 of February 2008- COBECOS 5 Focus for the next 6 months Finalizing of the data collection for the case studies – as soon as possible Interim activity report – JRC before Easter WP 2 Data Collection finalised: - pending on submission of data –Submission of all data –Report WP 4 Data harmonisation finalised: - Harmonisation of data from all fisheries, pending submission – pending on submission of data - Report WP 5 Estimation of theoretical relationship finalised: - month 18 (July 2008) - Estimation of theoretical enforcement relationships - Report WP 6 Software development – implementing the software Preparation of the periodic reports; activity and management (financial) – May + 45 days Implementing the FLR software.


Download ppt "Brest, 27 – 29 of February 2008- COBECOS 1 COBECOS SIXTH FRAMEWORK PROGRAMME PRIORITY 8.1 Policy-Oriented Research Second progress meeting Brest, 27 th."

Similar presentations


Ads by Google