FLOW THROUGH WATER TREATMENT SYSTEM USING ALUM & PAM REEDY CREEK IMPROVEMENT DISTRICT
2
BRIDGE DEMOLITION PROJECT @ EPCOT WINTER 2000
3
High Pressure Water Blasting To Remove Concrete Down To Rebar
4
After Blasting With 15,000 psi Water Jet
5
Runoff Turbidity Greater Than 300 NTUs
6
Runoff Diverted Into Bridge Stormwater System
7
Aluminum Sulfate Added Via Gravity Feed From Trailer Rig
8
Wood Baffle Boards Skim Large Concrete Debris & Provide Alum Mixing
9
Runoff Flows Into 1st Cell Of Three Stage Treatment System (Inflow >300 NTU)
10
1st Stage Treatment: Inflow>300 NTU Outflow 30 NTU
11
2nd Stage Treatment: Inflow 30 NTU Outflow 17 NTU
12
Polyacrylamide (PAM) Floc Log Used For Final Polishing (40-50% Turbidity Reduction) & Free Aluminum Binding
13
Final Discharge Water Sheet Flows Over Grass Berm (Trapping Sediment)Then Into Canal Behind Floating Turbidity Boom
14
Canal Receiving Water 15 NTU Final Discharge Water 10-12 NTU
15
Self Contained Water Treatment System
16
Treatment System Performance: System Usage:15 Days Daily Volume:80,000 Gallons Total Pumping Volume:96 Million Gallons Alum Usage:40 Gal / Day (600 Gal Total) Treatment System Size:50 x 15 Ft. Turbidity Reduction (NTU):>300 (Inflow) 15 (Outflow) % Turbidity Reduction:95 % Contractor’s System Cost:< $1,000 Time Lost Due To Non-Compliance:NONE!
17
Contractor:Hubbard Construction Contact:Jeff Forsythe (407)560-0442