Low Cost Infrastructure project SNCNW2003; 2003-09-08 Jan Markendahl
2
Starting point of research Wireless systems 2015 -Data rates,capacity ~100 time larger than today -Cost ~ todays GSM voice services Current Cellular solutions -Cost ~ bandwidth, capacity Cost structure of cellular solutions today -Telecommunication equipment is not the dominant part of operator costs -Costs of Sites, Operation& Maintenance, Interconnection are the major costs for the network
3
Low Cost Infrastructure project Attack the problem from two sides Set of solutions Problem Reduce other costs than telecom equipment, e.g sites, planning Find good wireless solutions and ”trade off´s” between bandwidth, QoS, coverage and costs
4
Low Cost Infrastructure project
5
Use the current base station approach but make more cost efficient designs Use complex access points and reduce the number Use a large number of low complexity access points Move functionality from access points to the terminal Low Cost Infrastructure project Possible research directions
6
Low Cost Infrastructure project Research areas Use complex access points and reduce the number Use a large number of low complexity access points Move functionality from access points to the terminal AP´s with antenna arrays ”BIG cellular” Multiple Antenna terminals & MIMO processing Shared wireless networks Systems with MultipHop terminals AP´s for Local Access Providers AdHoc Heterogenious Networks
7
Low Cost Infrastructure project - WP´s AP´s with antenna arrays ”BIG cellular” Multiple Antenna terminals & MIMO processing Shared wireless networks Systems with MultipHop terminals AdHoc Heterogenious Networks WP3. Spatio temporal Designs WP2. Distributed AdHoc Infrastructure WP1. Infrastructure deployment strategies and business models AP´s for Local Access Providers Business models Cost structures
8
The project and the people Partners Stockholm School of Economics(SSE),FOI, SICS Ericsson, TeliaSonera Resources > 25 persons involved, 8 man years per year 5 KTH and FOI Scientists 6 PhD students 6 experts from Industry 4 senior scientists (advisors) from KTH, SSE, FOI 6 MSc thesis students every year Funding &Budget Project costs for 3 years ~ 12 MSEK Funding from SSF; KTH, FOI; Ericsson, TeliaSonera
9
Big Cellular Collaborative Antenna Systems Cellular Ad hoc Smart Repeater
10
Low Cost Infrastructure project Comment on business issues Learning curves, Moore`s law -Growth of performance/price is exponential New business models -dis-integration of vertical mobile market