Presentation is loading. Please wait.

Presentation is loading. Please wait.

Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle, max 1 line Titel, max 3 lines Insert Name of Author above.

Similar presentations


Presentation on theme: "Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle, max 1 line Titel, max 3 lines Insert Name of Author above."— Presentation transcript:

1 Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle, max 1 line Titel, max 3 lines Insert Name of Author above date under Header and Footer Creating permanent value from infrastructure investments The Fehmarnbelt Fixed Link: 10 October 2011 Ajs Dam 1

2 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Location of the Fehmarnbelt 10 October 2011 Ajs Dam 2

3 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Femern A/S A private organisation, 100 % owned by the Danish state Until 2013 Femern A/S is responsible for Economy, planning and approval of the project 2014 – 2020 responsible for construction of the fixed link From 2020 responsible for operation and maintenance Main office in Copenhagen, 70 employees (2011) Experience from the Great Belt Bridge and Øresund Fixed Link 10 October 2011 Ajs Dam 3

4 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) User finansed Estimated construction cost: 5,5 bn Euro (2008 prices) Financed by loans on the international capital market, backed by a state guarantee. Low financing costs Loans to be repaid by user fees from road and rail Estimated pay-back period 36 years (coast-coast) EU estimated contribution: 31 per cent (TEN-project) 10 October 2011 Ajs Dam 4

5 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) The technical solution: 10 October 20115 Ajs Dam

6 Fehmarnbelt Tunnel

7 Title, max 2 lines Insert picture by clicking the picture icon and choose Change picture (H12,7 x W10,6 cm) Text can be inserted in text box on the right of picture Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) 10 October 20117 Ajs Dam Fehmarnbelt Tunnel

8 Picturesize: H19,05 x W25,4 cm Insert full page picture or graphics, rightclick and send to back (NOT usable for text) 10 October 2011 Ajs Dam 8 Year Ferry Vehicles in total 1999: 2.9 mil. vehicles 2001: 5.3 mil. vehicles 2009: 9.3 mil. vehicles 5.2 mil. travelers 14.0 mil. travelers 26.4 mil. travelers Travelers in total Why we are building the Fehmarnbelt Fixed Link Our experience from the Øresund Fixed Link:

9 Picturesize: H19,05 x W25,4 cm Insert full page picture or graphics, rightclick and send to back (NOT usable for text) 10 October 2011 Ajs Dam 9 Experience from the Great Belt: 30 % new traffic

10 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Structural development behind the traffic numbers The traffic is not a goal as such – the increased traffic rather indicates that the industries thrive on the new opportunities. The traffic numbers show what happens, when you remove the barriers that restrain the business communities. 10 October 2011 Ajs Dam 10

11 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Case The Great Belt Bridge has created an increased flexibility for the transport sector... The Danish Supermarket Ltd will also in the future analyse the opportunities for optimising the logistics. - Poul Hørslev, logistics manager, The Danish Supermarket Ltd, a major Danish corporation with several chains of stores 10 October 2011 Ajs Dam 11

12 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Fortune favours the brave… 10 October 2011 Ajs Dam 12

13 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) Lessons learned from regional integration The Great Belt Bridge: Almost no lasting development of business communities close to the construction sites However, the bridge has created new growth in general The Øresund Link: it took a while but 10 years later, there is a fully integrated metropolis region with a highly flexible workforce = In order to create the local structural changes that will last, we need to support the business communities during all stages of the process 10 October 2011 Ajs Dam 13

14 Creating jobs during construction Direct employment effect of 25.000 – 30.000 man years This corresponds to 3.500 to 4,200 jobs per annum Peak 2015-2019 up to 7.500 jobs per annum Requested competences: everything from unskilled labour and craft to consulting and counselling 10 October 2011 Ajs Dam 14

15 … and after construction The region is geared to new and permanent business clusters: Industries present in all regions: Life science/health Food industry Information technology and media Logistics Green technology Tourism Industries present in some regions: Financial services Cultural sector Nanotechnology Maritime industry 10 October 2011 Ajs Dam 15

16 Titel max 2 lines Normal text in bullets, max 3 levels Change levels on texts by using Increase / Decrease List Level" (Placed under Home / Paragraph : ) What is the status of the project? Currently: working hard on finalising our Environmental Impact Assessment report. 2012: Construction work put out to tender 2013: Construction Act draft is expected to be presented to the Danish parliament 2014: Construction begins Construction period, incl. preparation of manufacturing plant in Rødbyhavn (approx. 6½ years) The aim is for the fixed link across Fehmarnbelt to open to traffic in 2020 10 October 2011 Ajs Dam 16

17 10 October 2011 Ajs Dam 17 http://blog.femern.com/ www.femern.com


Download ppt "Select a frontpage and insert content – remember to delete all other frontpage slides Subtitle, max 1 line Titel, max 3 lines Insert Name of Author above."

Similar presentations


Ads by Google