REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) GRID CODE 3 rd Athens Forum October 24&25 Philippe RUSSE (EDF)33 1 47 65 26 07 Christian LAUNAY (EDF)33.

Similar presentations


Presentation on theme: "REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) GRID CODE 3 rd Athens Forum October 24&25 Philippe RUSSE (EDF)33 1 47 65 26 07 Christian LAUNAY (EDF)33."— Presentation transcript:

1 REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) GRID CODE 3 rd Athens Forum October 24&25 Philippe RUSSE (EDF)33 1 47 65 26 07 Christian LAUNAY (EDF)33 1 43 69 23 40 Nicolas KATCHAROV (EDF-BEC)33 1 56 65 21 49

2 EDF Project: Setting up a Grid Code for all REM participants

3 French Government REM GRID CODE European Commission DG Tren EDF

4 Study Goals Common REM Grid Code Redaction Adaptations of existing National Grid Code (if any) to the REM Grid Code for each entity

5 Project Cost 754 k for the project team, 33 mm, 10 mm on site

6 What is a GRID CODE ? A set of technical rules: Deal with investment, maintenance and operation, Define the breakdown of responsibilities, Guarantee equity for customers and a quality level for services. The regulator validates these rules. REM GRID CODE

7 Relations in an integrated system The technical rules between Generation, Customers and other national companies exist but are implicit. The breakdown of responsibility are not clearly defined The information flows are not clarified The participants are limited and technicians. REM GRID CODE

8 Relations in a non integrated system Increase of participants in the system: Traders, Independent Producers, whose responsibilities have to be clearly defined, Equity forces transparency Increase of information flows and system complexity Thus, necessity of explicit rules. REM GRID CODE

9 Interest of a common GRID CODE To Guarantee a quality standard level for services in the whole area To Clarify the responsibilities between REM participants To Redefine the information flows To Guarantee equity for the whole area To Insure fluidity for the Trans-border exchanges To Guarantee homogeneous investments for the whole area REM GRID CODE

10 METHODOLOGY Propose a common REM Grid Code, compliant with UCTE rules and EU recommendations Taking into account national specificities in order to propose a national REM Grid Code Two workshops to present electricity market examples and exchange experiences REM GRID CODE

11 ORGANISATION Steering Committee: to facilitate the relationship between the Project team and the counterparts and to validate the Project outputs. Composed with 10 representatives from the beneficiary entities, two representatives from neighbouring countries, one representative from EU, UCTE, ETSO, French Government and the EDF project manager and the EDF area manager Technical counterparts, nominated by the committee to work with the project team Project team: 12 EDF experts REM GRID CODE

12 TIMING 7 month duration for the whole project First steering committee expected in end of January First work shop in March and presentation of the draft REM Grid Code Conclusions and second workshop in July REM GRID CODE