Presentation is loading. Please wait.

Presentation is loading. Please wait.

Water supply problems in HICs. Quality of water Using p142 complete the diagram.

Similar presentations


Presentation on theme: "Water supply problems in HICs. Quality of water Using p142 complete the diagram."— Presentation transcript:

1 Water supply problems in HICs

2

3

4 Quality of water Using p142 complete the diagram

5 Spatial imbalance

6

7

8 Spatial variations Study Figure 10 (student book p. 142). Then complete a copy of the diagram below by: Marking and labelling each of the following: dam, reservoir, hillside, road, valley sides. Add notes to your copy explaining why water is transported from the north and west of Britain to the south and east.

9 Seasonal variability

10 Seasonable variability

11 Seasonal variability: Costa del Sol

12

13 Mark scheme

14 Loss through broken pipes Study student book p. 143, then answer these questions: (a) When was the water distribution in London constructed? (b) What happened as demand increased? (c) What did this lead to? (d) When was a new ring main built? (e) How much water is supplied daily via the ring main?

15 2009: Past paper question Describe two problems of water supply in high-income countries. (4)


Download ppt "Water supply problems in HICs. Quality of water Using p142 complete the diagram."

Similar presentations


Ads by Google