Download presentation
Presentation is loading. Please wait.
Published byMarcus Wilkins Modified over 9 years ago
1
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install COMMISSION @ TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & Run @ RCNP Procure/Install Install
2
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install COMMISSION @ TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & Run @ RCNP Procure/Install Install Kicker Ceramic Beamtube Install Design/OrderFabricate Install
3
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN BL1U KICKER 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) Remove BL1B, Core M13 block KICKER: Kicker Design & ReviewOrder/Fabricate/Deliver Install Design & Out for quotes (8) Bid Time & Place Order (29) Vendor final design & Fabr. (324) Acceptance tests & Receive (60) Unpack & Test (19) Ceramic Beamtube & Stands Finalize design & Order (71) Fabricate/Assemble (136) Prepare to Install (15) Design & Review (117) Design/OrderFabricate Install
4
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN BL1U SEPTUM 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) Remove BL1B, Core M13 block SEPTUM: Septum TestInstall Order/ModDesign Review & Finalize design (129) Place Order (15) Fabricate Septum Mods (80) Receive & Assemble Septum (110) Map & Test Septum (60) Vacuum Box & Stand Review & Finalize design (45) Place Order (15) Fabricate (95) Assemble (20) Prepare to Install (10) Prepare to Install (40)
5
2011 2015 2014 2013 2012 2016 2017 ACTIVITY J A J O J A Schedule( 2010-2016 ) UCN Timeline & Major Milestones 2011 2015 2014 2013 2012 2016 2017 Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 MESON HALL CLEAN-UP: MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) * Joint RCNP/TRIUMF/Acsion effort Remove BL1B, Core M13 block Shielding UCN APPARATUS: Spallation Target * UCN Source BEAMLINE: Kicker Septum Dipole Beamline (incl quads, PS, etc…) Design & ReviewOrder/Fabricate/Deliver Install Test Install Order/Mod Order/Fabricate Design Order/Fabricate InstallTest Install Design/Prototype/Fabricate Design/FabricateInstallUnInstall Procure shielding blocksDesign Install COMMISSION @ TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier He Liquefier System Procure UCN Source Commissioning Install/Test & Run @ RCNP Procure/Install Install Kicker Ceramic Beamtube Install Design/OrderFabricate Install
6
List of Major Milestones 2012 – DecUCN Source & Spallation Target installation at RCNP. UCN/nEDM prototyping & commissioning begins. 2014 – AprKicker (or Kicker Ceramic Beamtube) Installation completed. 2014 – AugUCN/nEDM RCNP phase completed. Uninstall & transport to TRIUMF. 2014 – DecMeson Hall Clean-up completed. 2015 – AprUCN Source & Spallation Target received at TRIUMF. Installation of Target & Source. 2016 – MarUCN Beamline (BL1U) Installation completed. 2016 – MarCommission UCN Facility using low intensity beam.
7
Kicker
8
Septum
9
Dipole
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.