Download presentation
Presentation is loading. Please wait.
Published byNeil Armstrong Modified over 9 years ago
1
ELECTRI Council Meeting Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of Civil Engineering University of New Mexico vv@unm.edu
2
ELECTRI Council Meeting Background Information technology – involves the development, maintenance, and use of computer systems, software, and networks for storing, processing and distributing data ▫ e.g., accounting, contractual documents, safety incidents, information exchange, production records, equipment records, cost records, real-time project monitoring Productivity and performance improvement. Slow pace adoption in the construction industry. ▫ Difficult to determine the benefits
3
ELECTRI Council Meeting Motivation Challenges faced by line contractors: ▫ Repair and expand the electric grid ▫ Make the grid more productive, cost-effective and smarter ▫ Renewable-energy sources (Ferry 2009) ▫ Unique working conditions Information technology systems – importance and challenges ▫ Data Management/sharing ▫ Integration ▫ Update
4
ELECTRI Council Meeting Objectives Goal: To identify the requirements of innovative and efficient information technology systems for line contractors. Objectives: ▫ Identify implementation of IT ▫ Evaluate the efficiency of IT Importance and satisfaction ratings ▫ Identify issues associated to IT and potential solutions
5
ELECTRI Council Meeting Expected Outcomes Dissemination through an article for the Electrical Contractor (EC) Magazine Report ▫ descriptive statistics of electrical contractors surveyed, (e.g., company size, years of experience, geographic zone, etc.), ▫ expected impact on project performance, ▫ current issues with information technology, ▫ prioritization of IT needs ▫ cost information, and, Recommendations for future research and implementation paths based on the results.
6
ELECTRI Council Meeting Methods Initial input from 5 line electrical contractors ▫ Identify categories of IT systems Development and deployment of survey: ▫ The contractor’s experience with IT ▫ IT implementation process ▫ Effect of the usage of IT on projects ▫ Issues associated with IT implementation ▫ Importance and satisfaction ratings Survey deployed to line electrical contractors. (Matzler 2004)
7
ELECTRI Council Meeting Main activities and dates of completion Background (09/2013) Survey development and testing through interviews (10/11/2013) Survey deployment and data collection (01/2014) Summary of results and data analysis (04/2014) Preparation and submission of final report and articles (05/2014) Expenditures ▫ 2 undergraduate students ▫ Principal Investigator salary ▫ Supplies
8
ELECTRI Council Meeting Benefit to industry Prioritization of IT needs considering challenges of line contractors. Comparison of different features of IT Systems. Inform industry of current best practices, challenges and industry trends. Application of method for evaluating and prioritize industry needs. Product dissemination.
9
ELECTRI Council Meeting Information Technology Assessment for Line Electrical Contractors Vanessa Valentin, Ph.D. Assistant Professor Department of Civil Engineering University of New Mexico vv@unm.edu
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.