Lakes Creek Road Waste Transfer Station Construction highlights
2
Site layout
3
Floor plan
4
Last segment of 3
8
Splice and ply packers
9
Average 29.5m
10
Used packers
11
Test pile with gauges
12
Vehicle mounted test rig
13
Rubbish in weigh bridge area excavation
17
Broken pile
18
Fan blowing into weigh bridge excavation
20
Site December 2013
21
Site January 2014
22
February rain rain rain
23
Site February 2014
24
Site March 2014
25
Site April 2014
26
Relieving slab
27
Suspended slab – office and amenities
28
Suspended slab – education centre
29
Tip bin - safety gate
30
Tip bin lifting
31
Tip bin tipping
32
Scabbling push pit floor
33
Scabble finish
34
Bobcat scabbler
35
Site May 2014
36
Push pit edge topping steel plate
38
Site June 2014
39
Fog system- dust suppression
40
Fog delivery line
41
20000 litre tank- fog and toilets
42
Push pit ready for topping
43
Finishing tipping floor topping
44
Site July 2014
45
Weigh bridge ready for steel floor
46
Grab arm control panel
47
Grab arm
48
Grab
49
Placing asphalt
50
Guard rail post installer
51
Site August 2014
52
Bio-retention drain
54
Site September 2014
55
Continuous flight auger drill rig and reo cages
56
Grout agitator and pump
57
Lifting reo cages
58
General view of new sewer alignment
59
450 sewer under by pass while new manhole and MSCL pipe are constructed
60
750 MSCL pipe supported on concrete beam