Presentation is loading. Please wait.

Presentation is loading. Please wait.

09-2857 Cross-Town Improvement Project Project Update Ron Schaefer January 20, 2009.

Similar presentations


Presentation on theme: "09-2857 Cross-Town Improvement Project Project Update Ron Schaefer January 20, 2009."— Presentation transcript:

1 09-2857 Cross-Town Improvement Project Project Update Ron Schaefer January 20, 2009

2 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 2 Contents CTIP project background Confirmed participants Recent activities Development status Upcoming tasks Schedule Sneak preview Questions

3 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 3 Cross-Town Improvement Project CTIP Components – Intermodal Exchange (IMEX) – Chassis Utilization (CUT) – Wireless Drayage Updating (WDU) – Real Time Traffic Monitoring (RTTM) – Dynamic Routing Guidance (DRG) CTIP Problem Statement The inefficiency of cross-town rubber tire interchanges creates conditions that adversely impact: Congestion Efficiency of the transportation network Safety of the motoring public Environment of neighboring communities Energy consumption CTIP Goal To develop and deploy an information sharing / transfer capability that enables the coordination of moves between parties. Maximize loaded moves and minimize unproductive moves.

4 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 4 Confirmed Participants Railroads: UP, BNSF, NS – Signed letters of authority – Data direct and through Railinc Dray Carriers: ITS, IXT, Lake Country Logistics, Comtrak Local and Regional Stakeholders: – MODOT, KDOT – KC Scout – Kansas City SmartPort – Mid-America Regional Council (MARC)

5 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 5 Recent Activities Re-engagement of motor carriers: – ITS, IXT, Lake Country Logistics, Comtrak – Refine motor carrier role in CTIP with respect to: RTTM requirements DRG requirements WDU expectations »Hardware needs Kickoff of RTTM and DRG in October 2009 – Schedule – Risks – Interface to other CTIP applications Railroad data feeds Support of CTIP Evaluation: – Escape EZ product for engine parameter data Selection of wireless device and mobile gateway products for WDU: – Apple iPhone – Vavni VMAP

6 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 6 CTIP Development Status IMEX: – Code and unit testing completed by 12/11/09 – Begin data feeds for railroads in January 2010 – CTIP detailed design document draft complete by 2/2010 CUT – Requirements and preliminary architecture complete – Finalize CUT data requirements by 1/2010 – Begin collecting chassis data 2/2010 WDU: – Hardware selections: VMAP Mobile gateway = Vavni Wireless device = Apple iphone (15- 20 phones) – Considering use of Xscape Ez Ez- TAP™ Bluetooth device to wirelessly transmit engine parameter data to support CTIP evaluation – Development underway; interface to external devices (mobile gateway, iPhones, etc.) will begin December 2009

7 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 7 CTIP Development Status RTTM – RTTM Kickoff held in KC on October 1, 2009. – Assessment of trucking company requirements and coordination with WDU application – October 2009. – Documentation of risks – Use cases and business rules complete. DRG: – System design underway – Use cases and business rules complete – Documentation of risks

8 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 8 Upcoming planned tasks IMEX: – Complete coding and testing including data feed from railroads/Railinc – Update IMEX based on development milestones from other applications (January – May 2010) WDU: – Interface from mobile gateway to IMEX – Interface from wireless device to mobile gateway – Finalize role of Escape EZ Bluetooth product to collect engine parameter CUT: – Refinement of user requirements based on chassis management company inputs RTTM: – Determine interface requirements for RTTM to WDU through mobile gateway – Complete system design DRG: – Evaluation of existing dynamic routing algorithm and existing roadway network – Complete system design

9 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 9 CTIP Schedule Application Development: – IMEX: December 2009 (SAIC) – CUT: February 2010 (SAIC) – WDU: March 2010 (SAIC) – RTTM: April 2010 (Delcan) – DRG: April 2010 (Delcan with Georgia Tech) Application Testing: – IMEX: January 2010 (SAIC) – CUT: March 2010 (SAIC) – WDU: May 2010 (SAIC) – RTTM: May 2010 (Delcan) – DRG: May 2010 (Delcan with Georgia Tech) USDOT Design Review: Late February 2010 Detailed Design Document (all applications): February 2010 User Training: May 2010 Deployment Test: May – December 2010

10 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 10 CTIP Front Page

11 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 11 Terminal Administration

12 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 12 Truck Company Capacity

13 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 13 Motor Carrier Work Order

14 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 14 Trip Assignments

15 Energy | Environment | National Security | Health | Critical Infrastructure 09-2857 © 2008 Science Applications International Corporation. All rights reserved. SAIC and the SAIC logo are registered trademarks of Science Applications International Corporation in the U.S. and/or other countries. 15 Questions? CTIP Website: www.ctip-us.com - Project management plan - Schedule - Project documents CTIP Program Manager: Ron Schaefer 618-257-8435 schaeferrl@saic.com


Download ppt "09-2857 Cross-Town Improvement Project Project Update Ron Schaefer January 20, 2009."

Similar presentations


Ads by Google